Laserfiche WebLink
L & M OPERABLE UNIT- FIRST QUARTER 2012 SITE STATUS, REMEDIAL SUMMARY, <br />AND GROUNDWATER MONITORING REPORT <br />Groundwater Monitoring and Sampling <br />April 30, 2012 <br />I:\Tidewater\TW Stockton (P2A)\QMRs\2012\1Q12\1Q12 QSSR QRSR QMR Stockton_FINAL.doc 2.21 <br />Well <br />Identification <br />SPH <br />Thickness <br />4Q11 (Feet) <br />SPH <br />Thickness <br />1Q12 (Feet) <br />Difference <br />(Feet) <br />2AMW-13 Sheen*Sheen*NA <br />2AMW-14 Sheen**Sheen**NA <br />MW-19 Sheen*Sheen*NA <br />DPE-1 Sheen**Sheen**NA <br />DPE-2 Sheen**Sheen**NA <br />DPE-3 Sheen**Sheen**NA <br />DPE-4 Sheen**Sheen**NA <br />DPE-5 Sheen**Sheen**NA <br />DPE-6 Sheen**Sheen**NA <br />DPE-7 Sheen**Sheen**NA <br />DPE-8 Sheen**Sheen**NA <br />DPE-9 Sheen**Sheen**NA <br />DPE-10 Sheen**Sheen**NA <br />DPE-11 Sheen**Sheen**NA <br />DPE-12 Sheen**Sheen**NA <br />DPE-13 Sheen**Sheen**NA <br />Definitions: <br />NA = Not applicable <br />SPH = Separate phase hydrocarbon <br />* = SPH removal occurred prior to groundwater sampling. <br />** = Connected to free product removal system