SITE MITIGATION PROGRAM CHECKLIST <br />SITE LOCATION: Srs /jr"-- 1,/ CLA.11-V i,,P <br />7 s kr--6--'1--- <br />,A#: voitvvi ,R# 05- 2,1 1 ei i -VI lf 0 <br />DATE ACTIVITY INITIAL <br />1." Review submittal and make sure all documents/fees have been submitted. <br />Request documents/fees not submitted. (44irr itilki <br />( q <br />Provide MFR to Accounting to ensure project ha FA#,nd a PR#. The PR# for a <br />agency changes, a n w PR# must be created under project does not change. If the lead <br />the existing FA. <br />T. 1 1/1 <br />Issue SR for Work Plan Review - Enter the data into the SR form in EC making sure <br />L - )( <br />to link the SR to the related FA. Generate an SR# and document on the permit form. If <br />no permit form has been submitted, record the information on a golden rod Service <br />Request form. Use this SR# on your DAR to track time spent obtaining documents/ <br />fees, reviewing work plan, issuing permits, coordinating field work activities, reviewing <br />subsequent report/sample results, making notifications/referrals. <br />Work Plan SR#: 1,711- Ly <br />LI .z... <br />Review Work Plan to ensure scope of work matches the scope of work approved by <br />construction/destruction meets SJC Ordinance Code <br />and well standards. the lead agency and that the mw <br />2,1 vi <br />a <br />Issue Permits - Enter permit information into WP form in EC, link to the FA# for the <br />WP# on DAR to track time spent in the field for the <br />on the permit. E Y project, and obtain a WP#. Use this <br />specific mw/boring activity specified <br />7_, ( vg. WP#: <br />0031140 <br />Scope: ) r ,,,, wi- 5,7, i „,,,,- <br />"2- <br />WP#: Scope: <br />WP#: Scope: <br />WP#: Scope: <br />WP#: Scope: <br />After scope of work on the well and boring permit WPs are complete, update the <br />following fields in the Well Permit Approval Dates section of the WP form in EC: Plan <br />Status - choose `Finaled'; Final Inspection - enter date permit finaled. <br />After all field work is complete, flag calendar to follow up on report of findings. <br />Report Review: <br />Projects -Review report to determine if <br />present, print out a 5021 and request a <br />2960. Provide 5021 to Accounting Office for <br />65 Notification. Send notification letter to CVRWQCB. <br />-Review report to determine next phase of work to <br />appropriate. Complete Prop 65 for any new <br />-Review report to determine if any immediate public <br />health concerns are found, notify supervisor <br />further notifications. Complete Prop 65 for any new <br />Environmental Assessment <br />contamination was found. If contamination <br />new PR# be issued under PE <br />processing. Complete a Prop <br />EHD Lead Oversight Projects <br />be conducted or if closure is <br />contaminants found at the site. <br />Other Lead Agency Projects <br />health issues are found. If public <br />immediately for follow up and <br />contaminants found at the site. <br />After scope of work for the project SR is complete, update the following fields in the <br />Service Request Approval Dates section of the SR form in EC: Plan Status - choose <br />`Finaled'; Final Inspection - enter date work finalized. <br />EHD-29 8/15/17 <br /> Site Mitigation Program Checklist