Laserfiche WebLink
2018 <br />AGE-NC-Project No. 12-2169 <br />Page 3 of 4 <br />LOCATION: JOB FUNCTION: LEVELS OF PROTECTION: <br />Exclusion Zone Drill borings A BCD Other <br />Reduction Zone Preserve samples <br />and log borings <br />A BCD Other <br />Support Zone Support functions A BCD Other <br />Specific protective equipment for each level of protection used is follows: <br />hard hat <br />steel-toed boots <br />half-faced respirator (if necessary) <br />gloves <br />Level D: safety glasses <br />If air purifying respirators are authorized, organic vapor and dust is the appropriate <br />canister for use with the involved substances and concentrations. No down-grading <br />changes of the specified levels of protection shall be made without the approval of the <br />site safety officer and the project team leader. <br />6.0. ON-SITE WORK PLANS <br />Work party(ies) consisting of two persons will perform the following tasks: <br />PROJECT TEAM LEADER: TASK: <br />Tim Cuellar Plan/coordinate collection of groundwater <br />monitoring samples. 1 <br />FIELD CREW: TASK: , <br />Rick Marty, Keith Lindgren Gauge/sample groundwater and <br />install/monitor soil vapor monitoring wells. <br />Advance 10' soil boring for soil samples. <br />The works party(ies) shall be briefed on the content of this plan prior to initiating onsite <br />work.