My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 1:31:47 PM
Creation date
5/27/2021 1:23:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W DR MARTIN LUTHER KING JR WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2018 <br />AGE-NC-Project No. 12-2169 <br />Page 3 of 4 <br />LOCATION: JOB FUNCTION: LEVELS OF PROTECTION: <br />Exclusion Zone Drill borings A BCD Other <br />Reduction Zone Preserve samples <br />and log borings <br />A BCD Other <br />Support Zone Support functions A BCD Other <br />Specific protective equipment for each level of protection used is follows: <br />hard hat <br />steel-toed boots <br />half-faced respirator (if necessary) <br />gloves <br />Level D: safety glasses <br />If air purifying respirators are authorized, organic vapor and dust is the appropriate <br />canister for use with the involved substances and concentrations. No down-grading <br />changes of the specified levels of protection shall be made without the approval of the <br />site safety officer and the project team leader. <br />6.0. ON-SITE WORK PLANS <br />Work party(ies) consisting of two persons will perform the following tasks: <br />PROJECT TEAM LEADER: TASK: <br />Tim Cuellar Plan/coordinate collection of groundwater <br />monitoring samples. 1 <br />FIELD CREW: TASK: , <br />Rick Marty, Keith Lindgren Gauge/sample groundwater and <br />install/monitor soil vapor monitoring wells. <br />Advance 10' soil boring for soil samples. <br />The works party(ies) shall be briefed on the content of this plan prior to initiating onsite <br />work.
The URL can be used to link to this page
Your browser does not support the video tag.