Laserfiche WebLink
Page 4 <br />Al! down-hole drilling and sampling equipment will be thoroughly cleaned with soap solution or <br />with steam before and after use. Investigation derived waste (IDW) generated from the sampling <br />activities will include soil and equipment decontamination rinseate water. The soil and water will <br />be containerized, separately, in 5-gallon DOT-approved buckets, and will remain on-site, at a <br />discrete location approved by the JCC/AOC, pending a determination of the appropriate method <br />of disposal based on analytical results. <br />SCHEDULE <br />En Prob is scheduled to conduct the field work on January 22 and 23, 2009. We will be at Site 1 at 0830 <br />hours on January 22. We anticipate that work at Site 1 will be completed by noon of that day at which <br />time we will mobilize to Site 2 and conduct field work there. The field work at Site 2 should be <br />completed no later than 1500 hours on January 23.