Laserfiche WebLink
M 1 WATERLOO FOOD AND FUEL GROUNDWATER ELEVATION CONTOUR MAP: HU 1&2 .WFS W-6A <br />'165' ovs`°s <br />DL <br />CPT PROJECT NO. AGE-NC-99-0559 FILE: WFF SP 17 DECEMBER 2012 <br />Rose Diagram Showing Ftraquency 05 <br />Historical Ground Water Flow Direction. <br />at Fortner Tank Pit Area APRIL 2013 \ASPHALT <br />FrESOSHIVd- <br />WFS-MW-13A/B <br />• <br />MW-8(destroyed well) <br />• <br />FS-MW-14A/B+ <br />5 <br />24 W-15A/B <br />.°CPT1 • <br />—EW- <br />aesoNlv <br />Res‘c0"s4. <br />LEGEND <br />= FORMER AND ACTIVE UST LOCATION <br />o SOIL BORING/ CPT LOCATION (Feb 2001) <br />cart CPT BORING LOCATION (Nov 2002) <br />owi'+ MONITORING WELL LOCATION <br />MULTI-LEVEL MONITORING WELL LOCATION <br />41) GROUNDWATER EXTRACTION WELL LOCATION (60-80 feet) <br />GROUNDWATER EXTRACTION WELL LOCATION (45-65 feet) <br />.WFS-MW-8 <br />.WFS-MW-7 <br />RSSNOSHilia. <br />0 <br />SCALE <br />75 <br />FEE <br />150 <br />