My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WINDMILL COVE
>
8503
>
2900 - Site Mitigation Program
>
PR0540185
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 4:49:08 PM
Creation date
5/27/2021 3:58:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0540185
PE
2953
FACILITY_ID
FA0022973
FACILITY_NAME
GLOBAL 7 OCEANIC
STREET_NUMBER
8503
Direction
W
STREET_NAME
WINDMILL COVE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
8503 W WINDMILL COVE RD
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Remediation <br />8503 Windmill Cove Rd, Stockton, CA <br />Unit Rate <br />Prep work <br />Total <br />Prep work plan and HASP 8 $ 150.00 $ 1,200.00 <br />Waste Profiling $ 200.00 <br />Project management (Coord with owner, SJCEH, USA, landfill) 8 $ 150.00 $ 1,200.00 <br />Site Work <br />Staff geologist 10 $ 110.00 $ 1,100.00 <br />misc field supplies (ice, PPE, sample tubes) 1 $ 200.00 $ 200.00 <br />mileage 140 $ 0.70 $ 98.00 <br />Subcontractors <br />Fremouw Environmental Services <br />Transportation <br />Excavate, transport and dispose of non-hazardous oily soil (CY) 40 $ 60.00 $ 2,400.00 <br />Excavate, transport and dispose of ACM (CV) 1 $ 245.00 $ 245.00 <br />Service vehicle 1 $ 250.00 $ 250.00 <br />Roll off bin delivery 2 $ 650.00 $ 1,300.00 <br />Transport bins to Hay Road Landfill 2 $ 895.00 $ 1,790.00 <br />Fuel surcharge (17% of total transport charge) $ 567.80 <br />Labor <br />Equipment Operator (regular time) 16 $ 85.00 $ 1,360.00 <br />Equipment Operator (overtime) 4 $ 102.00 $ 408.00 <br />Technician (regular time) 8 $ 75.00 $ 600.00 <br />Equipment, Materials and Supplies <br />Bin rental, estimated at 10 days ($12/bin/day) 10 $ 48.00 $ 480.00 <br />Bin liners 4 $ 30.00 $ 120.00 <br />Mini-Excavator 2 $ 550.00 $ 1,100.00 <br />1 CV boxes with liners and pallets for ACM 3 $ 95.00 $ 285.00 <br />bag of hydrophillic pads 1 $ 44.95 $ 44.95 <br />PPE 3 $ 35.00 $ 105.00 <br />Sales Tax (7.75%) 20.92 <br />McCampbell Analytical <br />Lab Costs (assuming 24 hr turnaround time) 8 $ 260.00 $ 2,080.00 <br />mark up on subs @ 10% $ 1,315.67 <br />Prepare Summary Report <br />Project Manager 14 $ 150.00 $ 2,100.00 <br />CAD Draftsman 4 $ 95.00 $ 380.00 <br />Clerical 3 $ 75.00 $ 225.00 <br />TOTAL $ 21,175.34 <br />Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.