My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WINDMILL COVE
>
8503
>
2900 - Site Mitigation Program
>
PR0540185
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 4:49:08 PM
Creation date
5/27/2021 3:58:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0540185
PE
2953
FACILITY_ID
FA0022973
FACILITY_NAME
GLOBAL 7 OCEANIC
STREET_NUMBER
8503
Direction
W
STREET_NAME
WINDMILL COVE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
8503 W WINDMILL COVE RD
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE ACTIVITIES <br />VIOBILIZATION <br />:Jews will begin mobilizing and lift barge to site immediately. <br />3IL & TRASH CONTAINMENT BOOM <br />Jpon arrival of the barges the crew will install oil & trash containment boom around the vessel. <br />3nce the oil & trash containment boom is installed the crew will begin pumping the barge closest to the dock. <br />PATCHING & PUMPING <br />With the vessel cleaned of debris the pumping process begins. All holes will be patched to slow water intake to a <br />ninimum and pumping of river water will be completed and the process of dragging up will begin. <br />HAZMAT INSPECTION & REMOVAL <br />Dnce all holes are secure Parker will inspect the vessel for any asbestos, oil or any other <br />lazmats and the report will list the location of said HazMats and the removal of the items will be completed by <br />icensed and certified crew. <br />DISMANTLING OF VESSEL <br />[he crew will follow the direction of the HazMat plan for respirators and excavator/shear and cutting equipment <br />tnd remove the pieces in 2 foot x 5 foot pieces and load onto the dumpsters. <br />DEMOBILIZATION & SHIPPING TO RECYCLING YARD <br />The 2x5 pieces will be loaded into the dumpsters and the site will be cleaned and graded <br />VIOBILIZATION AND PROCESS STARTS OVER FOR SECOND BARGE
The URL can be used to link to this page
Your browser does not support the video tag.