Laserfiche WebLink
SITE ACTIVITIES <br />VIOBILIZATION <br />:Jews will begin mobilizing and lift barge to site immediately. <br />3IL & TRASH CONTAINMENT BOOM <br />Jpon arrival of the barges the crew will install oil & trash containment boom around the vessel. <br />3nce the oil & trash containment boom is installed the crew will begin pumping the barge closest to the dock. <br />PATCHING & PUMPING <br />With the vessel cleaned of debris the pumping process begins. All holes will be patched to slow water intake to a <br />ninimum and pumping of river water will be completed and the process of dragging up will begin. <br />HAZMAT INSPECTION & REMOVAL <br />Dnce all holes are secure Parker will inspect the vessel for any asbestos, oil or any other <br />lazmats and the report will list the location of said HazMats and the removal of the items will be completed by <br />icensed and certified crew. <br />DISMANTLING OF VESSEL <br />[he crew will follow the direction of the HazMat plan for respirators and excavator/shear and cutting equipment <br />tnd remove the pieces in 2 foot x 5 foot pieces and load onto the dumpsters. <br />DEMOBILIZATION & SHIPPING TO RECYCLING YARD <br />The 2x5 pieces will be loaded into the dumpsters and the site will be cleaned and graded <br />VIOBILIZATION AND PROCESS STARTS OVER FOR SECOND BARGE