My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014109
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
19990
>
2600 - Land Use Program
>
PA-2100072
>
SU0014109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2022 3:07:37 PM
Creation date
5/27/2021 4:20:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014109
PE
2690
FACILITY_NAME
PA-2100072
STREET_NUMBER
19990
Direction
N
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
ACAMPO
Zip
95220-
APN
01733002 & 03
ENTERED_DATE
4/29/2021 12:00:00 AM
SITE_LOCATION
19990 N Frontage RD
RECEIVED_DATE
5/14/2013 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br />& Electric Company" <br />11. Cathodic Protection: PG&E pipelines are protected from corrosion with an "Imprassatl <br />Currant" cathodic protection system. Any proposed facilities, such as metal conduit, pipes, <br />service lines, ground rods, anodes, wires, etc. that might affect the pipeline cathodic protection <br />system must ba reviewed and approvetl by PG6E Corrosion Engineering. <br />12. Pipeline Marker Signs: PG8.E needs to maintain pipeline marker signs for gas <br />transmission pipelines in order to ensure public awareness of the presence of the pipelines. <br />With prior written approval from PG8.E Pipeline Services, an existing PGS.E pipeline marker sign <br />that is in direct conflict with proposed developments may be temporarily relocated to <br />accommodate construction work. The pipeline marker must be movetl back once construction is <br />complete. <br />13. PGS.E is also the provider of distribution facilities throughout many of the areas within <br />the state of California. Therefore, any plans that impact PGRE's facilities must be reviewed and <br />approved by PG8,E to ensure that no impact occurs which may endanger the safe operation of <br />its facilities. <br />PGS,.E Gas and Electric Facilities Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.