Laserfiche WebLink
Pacific Gas and <br />& E/ectric Company <br />8. Streets and Roads: Access to facilities must ba maintained at all limas. Street lights may be <br />allowed in the fee stri p(s) and/or easements) but in ali cases must ba reviewed by PGBE for <br />proper clearance. Roads and utilities should cross the transmission easement as nearly at right <br />angles as possible. Road intersections will not be allowed within the transmission easement. <br />9. Pipelines: Pipelines may be allowed provided crossings are held to a minimum and to be as <br />nearly perpendicular as possible. Pipelines within 25 feet of PGBE structures require review by <br />PGBE. Sprinklers systems may be allowed; subject to review. Leach fields and septic tanks are <br />not allowed. Construction plans must be submitted to PGBE for review and approval prior to the <br />commencement of any construction. <br />70. Signs: Signs era not allowed except in rare cases subject to Individual review by PGBE. <br />1 7. Recreation Areas: Playgrounds, parks, tennis courts, basketball courts, barbecue and light <br />trucks (pickups, vans, etc.) may ba allowed; subject to review of plans. Heavy equipment <br />access to PGBE facilities is to be maintained at all limas. Parking is to clear PGBE structures by <br />at least 1O feet. Protection of PGBE facilities from vehicular traffic is to be provided at <br />developer's expense AND to PGBE specifications. <br />12. Construction Activity: Since construction activity will take place near PGBE's overhead <br />electric lines, please be advised it is the contractor's responsibility to be aware of, and observe <br />the minimum clearances for both workers and equipment operating near high voltage electric <br />lines sat out in the High -Voltage Electrical Safety Orders of the California Division of Industrial <br />Safety (httos://www.d ir.ca.eov/Title8/s65 e2.htmll, as well as any other safety regulations. <br />Contractors shall comply with California Public Utilities Commission General Order 95 <br />(htto://www.couc.ca.eov/eos/G095/eo 95 s[artuo oa¢ehtntll and all other safety rules. No <br />construction may occur within 25 feet of PGBE'S towers. All excavation activities may only <br />commence after 87 7 protocols has bean followed. <br />Contractor shall ensure the protection of PGBE's towers and poles from vehicular damage by <br />(installing protective barriers) Plans for protection barriers must be approved by PGBE prior to <br />construction. <br />73. PGBE is also the owner of distribution facilities throughout many of the areas within the <br />state of California. Therefore, any plans that impact PGBE's facilities must b¢ reviewed and <br />approved by PGBE to ensure that no impact occurs that may endanger the safe and reliable <br />operation of its facilities. <br />PG8zF Gas and Electric Facilities Page 6 <br />