Laserfiche WebLink
CONDOR EARTH <br />John Lane, P.G. <br />Senior Geologist <br />Additional Subsurface Investigation and Well Installation Work Plan <br />San Joaquin County Public Works <br />June 19, 2017 <br />Page 7 <br />will include a discussion of the Site history, a description of the fieldwork conducted during this <br />investigation, a discussion and presentation of the interpreted lithology, hydraulic conductivity, and <br />relative contaminants collected from the CPT borings, as well as analytical results, conclusions, and <br />recommendations. <br />6.0 PROJECT SCHEDULE <br />Upon approval of this work plan by the Central Valley Water Board and authorization to proceed from <br />the property owner, drilling permit applications will be prepared and submitted to EHD, and Condor will <br />contact the drilling contractors to coordinate the fieldwork. Condor anticipates that the fieldwork will be <br />completed during the month of August 2017, with the resultant report submitted no later than October 31, <br />2017. <br />Please feel free to contact John Lane of Condor via telephone (209-938-1061) or email <br />jlaneAcondorearth.com) should you have any questions or concerns regarding this work plan. <br />Respectfully submitted, <br />Kyle DeAnda <br />Staff Geologist <br />X: \Project\5000_ptj \5960 SJC UST RFQ\5960C County of San Joaquin - SJC Public Works\5960C6\Reports\Work Plan\FR 20170616 596006 <br />WP MOTOR POOL.docx <br />CONDOR