My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 3:40:02 PM
Creation date
5/28/2021 3:33:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revocable Permit No. 17-1642 <br />Stratus Environmental, Inc. <br />Page 2 <br />The issuance of this permit by the City does not create any agency on the part of <br />the Permittee, and the permittee will hold the City of Stockton harmless for any <br />action for damages arising out of the Permittee's activities performed under this <br />permit. <br />In accordance with Section 1(h) of the "Standard Conditions Applicable to <br />Revocable Permits," the permittee shall provide and keep in force during the term of <br />the permit a policy of public liability insurance against liability for injuries to persons <br />or property arising out of accidents attributable to the structure on City property, in <br />amounts to be determined by the Risk Manager. The policy of insurance so <br />provided shall contain a contractual liability endorsement covering the liability <br />assumed by the Permittee by the terms of his permit and shall contain a provision <br />that such policy may not be canceled except after thirty (30) days notice in writing to <br />be given to the Risk Manager. The copies of these policies or certificates <br />evidencing the same shall be filed with the Risk Manager of the City after approval <br />of the City Attorney. <br />Permittee, or his contractor, shall obtain an Encroachment Permit for the installation <br />of the well. <br />Future well sampling, maintenance, and/or removal of the well shall require an <br />additional Encroachment permit. <br />7 The well head shall be covered with a meter box or valve box as approved by the <br />City of Stockton. The top of the box shall be flush with the surrounding ground or <br />concrete. <br />The provisions of the State of California, Department of Water Resources Bulletin <br />74-81 and 74-90 entitled "Water Well Standards: State of California" shall be <br />applicable to this permit. <br />Construction operations that create loud noise shall be confined between the hours <br />of 8 a.m. and 5 p.m. <br />Disposal of water from the well site shall be in accordance with current federal <br />regulations. <br />The barricading of any portion of City streets shall be subject to the approval of the <br />City Traffic Engineer. Traffic cones and warning signs shall be used to direct traffic <br />and shall be installed in accordance with the California Manual on Uniform Traffic <br />Control Devices.
The URL can be used to link to this page
Your browser does not support the video tag.