Laserfiche WebLink
201- 8 <br />AGE-NO Prol.e-a- 04 -1-23 q <br />Po-e4 of 7 <br />6.0. ON-SITE WORK PLANS <br />Work party(ies) consisting of two persons will perform the following tasks: <br />PROJECT TEAM LEADER: TASK: <br />Timothy J. Cuellar Plan/coordinate monitoring event; site safety <br />FIELD CREW: TASK: <br />Rick Marty/Keith Lindgren Collect groundwater and/or soil-vapor <br />samples; install soil-vapor wells <br />The work party(ies) shall be briefed on the content of this plan prior to initiating onsite work. <br />7.0. COMMUNICATION PROCEDURES <br />If hearing is impaired, the following standard hand signals will be used: <br />Hand gripping throat: Out of air; can not breath <br />Grip partner's wrist or both hands around waist: Leave area immediately <br />Hands on top of head: Need assistance <br />Thumbs up: OK; I am alright; I understand <br />Thumbs down: No; negative <br />Advanced GeoEnvironmental, Inc.