Laserfiche WebLink
Monitoring Well Installation Work Plan — March 2017 <br />SIERRA LUMBER CASE #2 <br />375 West HazeIton Avenue, Stockton, California <br />TABLE OF CONTENTS <br />SECTION PAGE <br />1.0. INTRODUCTION 1 <br />2.0. SCOPE OF WORK 1 <br />2.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES 2 <br />2.2. DRILLING AND SAMPLE ANALYSIS 2 <br />2.3. MONITORING WELL INSTALLATION, DEVELOPMENT, AND SURVEY 2 <br />2.4. GROUNDWATER SAMPLING AND ANALYSIS 3 <br />2.5. PREPARATION OF REPORT OF FINDINGS 3 <br />3.0. FIELD PROCEDURES 3 <br />3.1. BORING ADVANCEMENT AND SOIL SAMPLING 3 <br />3.2. WELL COMPLETION AND ELEVATION SURVEY 4 <br />3.3. WELL DEVELOPMENT 4 <br />3.4. GROUNDWATER SAMPLING PROCEDURES 5 <br />3.5. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT 5 <br />FIGURES <br />Figure 1 - Location Map <br />Figure 2 - Site Plan <br />Figure 3 - Approximate Extent of Dissolved TPH-G: HU4 <br />Figure 4 - Approximate Extent of Dissolved TPH-G: HU6 <br />Figure 5 - Proposed Monitoring Well Design <br />TABLES <br />Table 1 - Summary of Monitoring Well Details <br />Table 2 - Analytical Results of Soil Samples <br />Table 3 - Analytical Results of Grab Groundwater Samples <br />Table 4 - Groundwater Monitoring Results <br />APPENDICES <br />Appendix A -RWQCB Directive Letter <br />Appendix B -Monitoring and Sampling Procedures