Laserfiche WebLink
22 March 2017 <br />AGE Project No. 98-0448 <br />Page 5 of 5 <br />Developmental purging activities will be continued until field parameters (pH, electrical <br />conductivity, and temperature) have stabilized and purged water is visually sediment-free. <br />3.4. GROUNDWATER SAMPLING PROCEDURES <br />Groundwater sample collection will be performed in accordance with AGE's standard <br />monitoring and sampling procedures, which have been included as Appendix B. <br />3.5. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT <br />All sampling tools will be thoroughly rinsed with clean water after being washed with a <br />solution of Alconox. All down-hole drilling equipment will be pressure washed prior to <br />starting each boring. Rinseate and soil cuttings generated during drilling and groundwater <br />sampling activities will be containerized in properly labeled, Department of Transportation <br />(DOT)-approved 55-gallon drums and stored on-site in an area lacking public access. <br />Disposal alternatives will be evaluated based on the results of soil analysis.