My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2151
>
2900 - Site Mitigation Program
>
PR0541576
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 4:24:36 PM
Creation date
5/28/2021 4:15:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541576
PE
2960
FACILITY_ID
FA0023836
FACILITY_NAME
BOULEVARD AUTOMOTIVE SERVICE
STREET_NUMBER
2151
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12808030
CURRENT_STATUS
01
SITE_LOCATION
2151 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03 May 2017 <br />AGE Proposal No. 16-7172 <br />Page 5 of 8 <br />AdvancedGeo <br />Environmental <br />Wffig <br />Specific protective equipment for each level of protection used is follows: <br />hard hat <br />steel-toed boots <br />Level D: half-faced respirator (if necessary) <br />gloves <br />safety glasses <br />If air purifying respirators are authorized, organic vapor and dust is the appropriate <br />canister for use with the involved substances and concentrations. No down-grading <br />changes of the specified levels of protection shall be made without the approval of the <br />site safety officer and the project team leader. <br />7.0. ON-SITE WORK PLANS <br />Work party(ies) consisting of three persons will perform the following tasks: <br />PROJECT TEAM LEADER(S): TASK: <br />Daniel Villanueva Project Team Leader <br />FIELD CREW: TASK: <br />Drill Rig Operator Collect soil samples <br />Drill Rig Operator Advance borings <br />Drill Rig Assistant miscellaneous <br />The works party(ies) shall be briefed on the content of this plan prior to initiating onsite <br />work. <br />8.0. COMMUNICATION PROCEDURES <br />If hearing is impaired, the following standard hand signals will be used:
The URL can be used to link to this page
Your browser does not support the video tag.