Laserfiche WebLink
SITE MITIGATION PROGRAM CHECKLIST <br />SITE LOCATION: /'( - // SQL N j 0...641 <br />FA#: l <br />0 0 el;5 W - 7 2.-- PR# <br />DATE ACTIVITY f INITIAL <br />3 ei -7 Review submittal and make sure all documents/fees have been submitted. -1,-- <br />3Ni-I Request documents/fees not submitted. Se-t „la( dAtd <br />.7./2././ <br />Provide MFR to Accounting to ensure project has a FA# and PR#. The PR# for a <br />agency changes, a new PR# must be created under MA" project does not change. If the lead <br />the existing FA. <br />I il <br />Issue SR for Work Plan Review - Enter the data into the SR form in EC making sure <br />b, , X <br />to link the SR to the related FA. Generate an SR# and document on the permit form. If <br />no permit form has been submitted, record the information on a golden rod Service <br />Request form. Use this SR# on your DAR to track time spent obtaining documents/ <br />fees, reviewing work plan, issuing permits, coordinating field work activities, reviewing <br />subsequent report/sample results, making notifications/referrals. <br />Work Plan SR#: <br /> 0-4 <br />1.7 <br />1/ <br />1 <br />1 1 <br />Review Work Plan to ensure scope of work matches the scope of work approved by <br />construction/destruction meets SJC Ordinance Code the lead agency and that the mw <br />and well standards. <br />Issue Permits - Enter permit information into SR form in EC, link to the FA# for the <br />this SR# on DAR to track time spent in the field for the <br />on the permit. <br />project, and obtain an SR#. Use <br />specific mw/boring activity specified <br />?yr? 0) <br />SR# <br />SR#: Scope: s ...:,i <br />: Cr Scope: <br />SR#: Scope: <br />SR#: Scope: <br />SR#: Scope: <br />After scope of work on the well and boring permit SRs are complete, update the <br />following fields in the Service Request Approval Dates section of the SR form in EC: <br />Plan Status - choose `Finaled'; Final Inspection - enter date permit finaled. <br />After all field work is complete, flag calendar to follow up on report of findings. <br />Report Review: <br />Projects -Review report to determine if <br />present, print out a 5021 and request a <br />2960. Provide 5021 to Accounting Office for <br />65 Notification. Send notification letter to CVRWQCB. <br />-Review report to determine next phase of work to <br />appropriate. Complete Prop 65 for any new <br />-Review report to determine if any immediate public <br />health concerns are found, notify supervisor <br />further notifications. Complete Prop 65 for any new <br />Environmental Assessment <br />contamination was found. If contamination <br />new PR# be issued under PE <br />processing. Complete a Prop <br />END Lead Oversight Projects <br />be conducted or if closure is <br />contaminants found at the site. <br />Other Lead Agency Projects <br />health issues are found. If public <br />immediately for follow up and <br />contaminants found at the site. <br />After scope of work for the project SR is complete, update the following fields in the <br />Service Request Approval Dates section of the SR form in EC: Plan Status - choose <br />'Finaled'; Final Inspection - enter date work finalized. <br />EHD-29 6/23/2015 Site Mitigation Program Checklist <br />4