Laserfiche WebLink
JITE MITIGATION PROGRAM CHECKLIST <br />SITE LOCATION: c, i 0 pi . 1-1 A40.44--e...-- Sf. <br />FA#: OA, 2.- VI -7 PR# e6 - 1 - t i , <br />DATE ACTIVITY INITIAL <br />Review submittal and make sure all documents/fees have been submitted. <br />Request documents/fees not submitted. <br />57.23a,i, f., <br />I" <br />Provide MFR to Accounting to ensure project has a FA# and a PR#. The PR# for a <br />agency changes, a new PR# must be created under L. ..." project does not change. If the lead <br />the existing FA. <br />-i <br />6/04,1 v <br />—7 14 <br />Issue SR for Work Plan Review — Enter the data into the SR form in EC making sure <br />an SR# and document on the permit form. If <br />record the information on a golden rod Service <br />DAR to track time spent obtaining documents/ <br />permits, coordinating field work activities, reviewing <br />making notifications/referrals. <br />L.-, )( <br />to link the SR to the related FA. Generate <br />no permit form has been submitted, <br />Request form. Use this SR# on your <br />fees, reviewing work plan, issuing <br />subsequent report/sample results, <br />6 -4 i 4 Work Plan SR#: 00 1,61 tvi LX <br />71-u <br />4-1 1 .-1, <br />Review Work Plan to ensure scope of work matches the scope of work approved by <br />construction/destruction meets SJC Ordinance Code L ..„.. the lead agency and that the mw <br />and well standards. <br />) <br />Issue Permits - Enter permit information into WP form in EC, link to the FA# for the <br />WP# on DAR to track time spent in the field for the <br />on the permit. L_ -x project, and obtain a WP#. Use this <br />specific mw/boring activity specified <br />-lilio <br />WP#:0031(tgi ..-- Scope: z soil G. <br />Scope: <br />) <br />WP#: • <br />WP#: Scope: <br />WP#: Scope: <br />WP#: Scope: <br />After scope of work on the well and boring permit WPs are complete, update the <br />following fields in the Well Permit Approval Dates section of the WP form in EC: Plan <br />Status — choose 'Finaled'; Final Inspection — enter date permit finaled. <br />After all field work is complete, flag calendar to follow up on report of findings. <br />Report Review: <br />Projects -Review report to determine if <br />contamination present, print out a 5021 and request a <br />2960. Provide 5021 to Accounting Office for <br />65 Notification. Send notification letter to CVRWQCB. <br />-Review report to determine next phase of work to <br />appropriate. Complete Prop 65 for any new <br />-Review report to determine if any immediate public <br />health concerns are found, notify supervisor <br />further notifications. Complete Prop 65 for any new <br />Environmental Assessment <br />contamination was found. If <br />new PR# be issued under PE <br />processing. Complete a Prop <br />EHD Lead Oversight Projects <br />be conducted or if closure is <br />contaminants found at the site. <br />Other Lead Agency Projects <br />health issues are found. If public <br />immediately for follow up and <br />contaminants found at the site. <br />After scope of work for the project SR is complete, update the following fields in the <br />Service Request Approval Dates section of the SR form in EC: Plan Status — choose <br />'Finaled'; Final Inspection — enter date work finalized. <br />EHD-29 8/15/17 <br /> Site Mitigation Program Checklist