My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 4:50:07 PM
Creation date
5/28/2021 4:35:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEALTH AND SAFETY PLAN (HASP) <br />Tailgate Safety Meeting Form <br />Site Name & Number: <br />ATC Project Number: <br />Work Being Performed: <br />Date & Time of Meeting: <br />Name of Presenter: <br />NOTE: On the initial day of the project, the Project Manager or designee should conduct a visual inspection of the <br />project site (using the Site Safety Checklist) prior to the Tailgate Safety Meeting. This inspection should include a review <br />of project site equipment, hazards, and specific job tasks, activities or operations to be performed for that day. These <br />specific items must be covered during the Tailgate Safety Meeting. For subsequent days, any changes to the site or <br />operations must be covered in the Tailgate Safety Meeting. In addition, "Task-Specific" Job Safety Analysis (JSA) for <br />the tasks/activities at the project site must be integrated into the HASP and Tailgate discussions. <br />Itemize the Specific Topics Discussed (if more space is needed use the back of this page): <br />CI Are all employees okay? 0 Are all employees physically able to perform their job duties? 0 "Shared Learning" items? <br />0 Has PPE been checked? ClEmergency evacuation area identified? 0 Asked for Sub interactions or questions? <br />CI Client Requirements - By checking the box to the left, the Presenter of the Tailgate Meeting acknowledges that all Client- <br />specific requirements have been completed for both ATC and Subcontractor employees. <br />Participants (if needed, list additional participants on back of this page): <br />Print Name Signature Company Date <br />A Tailgate Safety Meeting must be conducted and documented at the beginning of each workday when two or more ATC <br />employees and/or Subcontractor representatives are present on site. Employees, client representatives and subcontractors who <br />arrive at the site after the Tailgate Safety Meeting has been conducted must be briefed on the topics and acknowledge by signing <br />this form. The JSA must be completed at the beginning of each day when one or more ATC employees and/or subcontractor
The URL can be used to link to this page
Your browser does not support the video tag.