My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DIAMOND
>
801
>
2900 - Site Mitigation Program
>
PR0541894
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2021 10:50:12 AM
Creation date
6/1/2021 8:35:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541894
PE
2950
FACILITY_ID
FA0022925
FACILITY_NAME
BNSF RAILWAY MORMON RAIL YARD
STREET_NUMBER
801
STREET_NAME
DIAMOND
STREET_TYPE
ST
City
STOCKTON
Zip
95205-7019
CURRENT_STATUS
01
SITE_LOCATION
801 DIAMOND ST
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Field Services Date(s) TBD; up to one week of drilling for initial planned drilling; April or May 2016 <br />Site Name Mormon Yard <br />Location 801 Diamond St., Stockton <br />Client Site Contact Utilis Vinson (Super. <br />of Operations) <br />209-460-6202 <br />or <br />Joe Gist (Man. of <br />Yard Operations) <br />209-460-6336 <br />Client Site <br />Telephone <br />Type of Investigation: <br />Sampling Investigation: <br />7 Hand Auger <br />El Drilling <br />El Trenching <br />El Well Installation (possible) <br />El Soil Sampling (possible) <br />IZ Groundwater Sampling (possible) <br />LII Other: <br />Site Remediation: <br />7 Excavation <br />Treatment System Installation/O&M <br />Underground Storage Tank (UST) Removal <br />Kennedy/Jenks Consultants <br />Health and Safety Plan (HASP) Summary <br />Project Name <br />Prepared by <br />BNSF Mormon Yard Project No. 1665020*00 <br />Lauren Knickrehm/Mike McLeod Date 2/27/2016 <br /> <br />Project Laura Kennedy <br />Manager <br />Office San Francisco <br /> <br />Field Services Description <br />El Site Walk-through LII Other: <br /> <br />BNSF Mormon Yard — Soil Sampling <br />Site-Specific Health and Safety Plan <br />Mormon Yard, Stockton, California <br />© 2016 Kennedy/Jenks Consultants <br />Ilsfocadtprojectstis-projt201311365020.01_bnsf stockton work plan12016 hrsc work plantappendicestappendixb_hasp12016_hasp_2015contentinatdocx <br />Page iv
The URL can be used to link to this page
Your browser does not support the video tag.