Laserfiche WebLink
Kennedy/Jenks Consultants <br />Section 7: Protective Actions <br />7.1 PPE <br />Field personnel will wear equipment to protect against potential physical and chemical hazards, <br />which have been identified herein and those that become apparent in the field. All PPE will be in <br />compliance with BNSF MWORs (Appendix B) and will include, Guidelines for Contaminants <br />Commonly Encountered at Kennedy/Jenks Consultants Sites provide guidance in assessing <br />potential hazards and selecting the appropriate protection. Level D protection will be required at <br />a minimum for field activities at the site. Level D personal protective equipment to be used may <br />include all items on the following list that are denoted by an asterisk (*). <br />The level of protection employed may be upgraded, as deemed necessary by the SSO. If <br />non-routine field activities are initiated, the level of protection will be specified in the <br />activity-specific health and safety addenda. <br />Personal Protective Equipment (PPE) and Monitoring Equipment <br />IE] Eyes: E Safety Glasses LII Face Shield <br />[Z1 Boots: E Safety-Toe Z Work E Rubber 0 Other <br />Z Class II BNSF approved High-Visibility Reflective <br />Safety Vest with reflective "X" design on vest back <br />Z Hard hat <br />Z Ear Muffs/Plugs <br />Z Work Gloves E Neoprene 1=I Rubber Z Nitrile <br />LII Suits: LI Cotton ill Tyvek Nylon LI Other <br />1=1 Respirator: (Type/Cartridge: specify) <br />Z Emergency Eyewash LII Emergency Shower <br />1=1 Spill Kit <br />LI Fire Extinguisher <br />Z First Aid Kit <br />LI Life Jackets 111 Rescue Life Ring <br />111 Safety Belt/Harness/Tripod <br />0 Lights (type: Flashlight) <br />111 Camera/Video <br />Z Cell Phone <br />LI Lockout Tags and Locks <br />LI Ventilator/Fan <br />Volt/Ampere Meter <br />Four Gas Meter (calibration date: specify) <br />111 OVA (calibration date: specify) <br />Z PID (calibration date: specify) <br />1=1 Hydrogen Sulfide Meter (calibration <br />date: specify) <br />LI Draeger Detection Tubes <br />LI Soil Sampling Kit <br />LI pH Meter/Paper <br />LI Conductivity/Temperature Meter <br />111 Metal Detector <br />Air Sampling Equipment <br />Peristaltic Pump (Tank Sampling) <br />10 Other: specify <br />LI Other: specify <br />7.2 Work Zones <br />All work on BNSF property will be conducted in a manner consistent with BNSF safe practices. <br />Staff working on BNSF property will have proof of completion of BNSF Contractor <br />Orientation/Safety training and proof of completion on an E-Railsafe background investigation. <br />No staff will be present within 4 feet of any active rail at any time during this project except for <br />incidental crossing of tracks in order to perform work. Any work within 25-feet of rail will require <br />track protection in accordance with BNSF MWOR11-12. Prior to crossing or fouling any active <br />track, staff will look both directions on all tracks for approaching trains, move deliberately to <br />BNSF Mormon Yard — Soil Sampling <br />Site-Specific Health and Safety Plan <br />Mormon Yard, Stockton, California <br />© 2016 Kennedy/Jenks Consultants Page 16 <br />Ilsfocathprojectslis-proj1201311365020.01_bnsf stockton work planI2016 hrsc work plarnappenclicestappendixb_hasp12016_hasp_2015content_final.docx