My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DIAMOND
>
801
>
2900 - Site Mitigation Program
>
PR0541894
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2021 10:50:12 AM
Creation date
6/1/2021 8:35:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541894
PE
2950
FACILITY_ID
FA0022925
FACILITY_NAME
BNSF RAILWAY MORMON RAIL YARD
STREET_NUMBER
801
STREET_NAME
DIAMOND
STREET_TYPE
ST
City
STOCKTON
Zip
95205-7019
CURRENT_STATUS
01
SITE_LOCATION
801 DIAMOND ST
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phone Number: <br />Other: (optional) <br />Other: (optional) <br />Other: (optional) <br />Other: (optional) <br />Other: (optional) <br />406-578-4500 <br />3. CONTRACTOR REQUIREMENTS <br />CONTRACTOR COMPLIANCE <br />Suppliers working for or with BNSF Railway Work Groups are REQUIRED to complete a Safety Action Plan (SAP). <br />The number of SAP's submitted by a particular supplier during a calendar year will vary based on factors such as <br />number of work locations and the nature of the work to be performed. <br />General Contractors may submit one Safety Action Plan to include sub-contractors on a project, or require each <br />sub-contractor to submit their own completed Safety Action Plan form. The General Contractor must clearly indicate <br />on a Safety Action Plan form that sub-contractors are included in coverage, when applicable. <br />A copy of the Safety Action Plan form is available for download at http://bnsfcontractor.com. <br />(http://bnsfcontractor.com) <br />Do you need to submit a Safety Action Plan? <br />Example 1: Service contractors, utility firms and Department of Public Work Groups that work at fixed locations <br />during the course of a year would only need to submit ONE Safety Action Plan form per calendar year, unless key <br />information changes during the course of the year. <br />Example 2: Engineering - Construction Contractors and public project contractors would submit project specific <br />Safety Action Plans. It is possible that a large contractor may have several projects underway at the same time <br />across the BNSF system requiring one Safety Action Plan per project. <br />Example 3: Fiber Optics firms and service contractors, who are constantly on the move during the course of the <br />work week, or during the course of the project, would need to indicate this in the Safety Action Plan form that <br />emergency response information is updated as necessary, maintained on-site and communicated during daily job <br />safety briefings. <br />SAFETY ACTION PLAN RETENTION & MAINTENANCE <br />Your company must maintain an ELECTRONIC COPY of the Safety Action Plan: <br />An electronic copy shall be uploaded in the BNSF Contractor Orientation web site at http://bnsfcontractor.com <br />(http://bnsfcontractor.com) <br />Your company must maintain HARD COPY of the Safety Action Plan:
The URL can be used to link to this page
Your browser does not support the video tag.