My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DIAMOND
>
801
>
2900 - Site Mitigation Program
>
PR0541894
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2021 10:50:12 AM
Creation date
6/1/2021 8:35:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541894
PE
2950
FACILITY_ID
FA0022925
FACILITY_NAME
BNSF RAILWAY MORMON RAIL YARD
STREET_NUMBER
801
STREET_NAME
DIAMOND
STREET_TYPE
ST
City
STOCKTON
Zip
95205-7019
CURRENT_STATUS
01
SITE_LOCATION
801 DIAMOND ST
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. FIRE PREVENTION <br />HOT WORK <br />Hot work can be defined as cutting and welding operations for construction/demolition activities that involve the use <br />of portable gas or arc welding equipment, or involve soldering, grinding, or any other similar activities producing a <br />spark, flame, or heat. <br />Will "Hot Work" activities be performed on BNSF property?No <br />FIRE PREVENTION AFFIRMATION <br />If "YES" was selected the following statements SHALL BE CHECKED and implemented within your safety <br />plan; by checking these statements you affirm that they will be accomplished. <br />Risk Assessment activities and Job Safety Briefings will identify procedures/strategies, and equipment available <br />for fire prevention and suppression, as well as, locations where suppression equipment will be staged. <br />In Right-of-Way areas, the local fire agency is contacted to check possible hot work bans or restrictions, and to <br />determine ability of local agency to provide emergency assistance. <br />In Right-of-Way areas, the BNSF Railway Right-of-Way Fire Prevention Risk Assessment form will be completed <br />and maintained on the job-site. <br />0 All right-of-way fires are to be reported to the responsible BNSF Project Manager or E1C. <br />List fire prevention and suppression equipment on-site. <br />This Safety Action Plan will not be accepted unless these are checked. <br />10. SAFETY AUDITING <br />FREQUENCY <br />Formal safety audits of on-site work activities will be conducted N/A e.g. twice/week, weekly <br />RESPONSIBILITY <br />NAME & TITLE WHO/WHAT/HOW/ <br />E.G.; ON-SITE SUPERVISOR E.G.; ALL EMPLOYEES / SAFETY AUDIT — TABLET TO DATABASE <br />N/A N/A <br />SAFETY AUDITING AFFIRMATION
The URL can be used to link to this page
Your browser does not support the video tag.