Laserfiche WebLink
Earth Systems <br /> <br />Southwest 1680 Illinois Ave. Suite 20 <br />Perris, CA 92571 <br />Ph: 951-928-9799 <br />Fax: 951-928-9948 <br />www.earthsystems.com <br />April 3, 2017 Proposal No.: SWP-17-058 <br />MEDISTAR CORP <br />7670 Woodway Drive, Suite 160 <br />Houston, Texas 77063 <br />Attention: Mr. Warren W. Barnes III, SVP <br />Subject: Proposal for Preliminary Geotechnical Engineering Report <br />Projects: Proposed Stockton Rehab Hospital <br />North California Street & Magnolia Street <br />Stockton, San Joaquin County, California <br />Based upon the request for a proposal dated March 20, 2017 Earth Systems Southwest [Earth <br />Systems] is pleased to submit this proposal to provide geotechnical services for the above <br />referenced project. Since 1969, the Earth Systems group of companies has provided expert geo- <br />professional services to assist our clients through all aspects of geotechnical and geologic <br />engineering, environmental engineering, and construction related materials testing and <br />inspection services. Through our previous work with the California Office of Statewide Health <br />Planning and Development (OSHPD) related projects, our dedicated staff understands the diverse <br />geotechnical, geologic, and construction-related issues that may affect the proposed project, and <br />will work to develop practical and economical geotechnical engineering solutions through <br />innovative approaches. <br />We have prepared this proposal based on our understanding of preliminary project information <br />provided, via email, on March 20, 2017. We postulate that the proposed rehab hospital will be <br />developed under the regulation of OSHPD, the 2016 California Building Code [CBC] and California <br />Geological Survey [CGS] Note 48 requirements (2013) for geotechnical reports submitted to <br />OSHPD. As such, we have scoped our proposal to address additional levels of reporting required <br />by these agencies. Based upon the anticipated conditions, the following sections describe our <br />understanding of the project and our anticipated scope of services in order to meet the above <br />requirements. <br />This project will be managed by Mr. Kevin Paul, GE 2930, who will also be providing the <br />engineering evaluation and report preparation. Mr. Mark Spykerman, EG 1174, will also provide <br />the interpretation of the site geologic conditions and will be the principal in charge of this project. <br />PROJECT UNDERSTANDING <br />We anticipate the proposed project will include construction of a two story 50-bed rehab <br />hospital. Total square footage of the planned building is approximately 60,000 ft'. Conventional <br />shallow continuous and square pad foundations with slab-on-grade floors are anticipated.