My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1515
>
2300 - Underground Storage Tank Program
>
PR0545645
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2021 12:15:33 PM
Creation date
6/1/2021 12:45:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0545645
PE
2351
FACILITY_ID
FA0025876
FACILITY_NAME
7 ELEVEN INC #38877
STREET_NUMBER
1515
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15904026
CURRENT_STATUS
01
SITE_LOCATION
1515 E MAIN ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. To determine lower tube distance from tank <br /> bottom to bottom of cut: <br /> Subtract valve length(W)from distance to tank <br /> bottom(8) <br /> M_(18)-(►N)= <br /> Cast lug <br /> Note: bower tube clearance must meet tank mane- in 7150 <br /> facturer requirements and all AHJ,local,state,and na- body <br /> tional codes. Typical clearance is about 4'. If lower Float direction <br /> tube clearance is not met valve must be removed and <br /> adjusted to meet these requirements. <br /> 3. To determine lower tube distance from tank <br /> bottom to top of cut <br /> Subtract valve length (U)from distance to tank <br /> bottom (8) <br /> (T)=(8)-M <br /> View into drop tube from above <br /> Note: Lower tube distance from tank bottom to top <br /> of cut must meet all AHJ,local,state,and national <br /> codes. For reference per 40 CFR 63 subpart CCCCCC I <br /> NESHAP the lower tube can be no more than 6u from <br /> the bottom of the tank, If lower tube distance is not <br /> met valve must be removed and adjusted to meet these <br /> requirements. <br /> 4. To determine float alignment: <br /> Looking into upper tube(see figure)the float should be <br /> aligned along the length of the tank. If float is not <br /> aligned properly adjustments need to be made. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.