My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
604
>
2900 - Site Mitigation Program
>
PR0542067
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:27 AM
Creation date
6/1/2021 12:55:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0542067
PE
2950
FACILITY_ID
FA0024157
FACILITY_NAME
CITY GARAGE
STREET_NUMBER
604
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23502301
CURRENT_STATUS
01
SITE_LOCATION
604 W ELEVENTH ST
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Partner Site-Specific Health and Safety Plan <br />Introduction <br />Partner Engineering and Science, Inc. (Partner) has been retained by Umpqua Bank to conduct a Phase II ESA at <br />the subject property. This Health and Safety Plan (HASP) document identifies the Health and Safety procedures <br />that are intended to guide the field activities at the site. The details of this plan apply to employees of Partner and <br />its subcontractors. Regulatory agencies are expected to observe the safety rules and regulations established by their <br />respective organizations in addition to the requirements of this document. <br />This plan must be reviewed and acknowledged by all personnel prior to entering the exclusion zone. In general, a <br />"Tailgate Safety Meeting" is conducted at the initiation of on-site activities and at the beginning of each day <br />thereafter until the completion of the project. However, the actual briefing may be conducted off-site (e.g., in the <br />office) if conditions preclude or render impractical its completion on-site. <br />This HASP will be a living document in that it will be continually updated and/or revised as the site conditions and <br />knowledge of the operations develop further. The development and preparation of the HASP has been based on <br />past experiences and site specific information at the time of preparation. If actual site conditions or operations vary <br />from the data used to prepare this HASP, amendments shall be made to reflect those changes. <br />This HASP has been developed with consideration to current safety standards, health effects, and standards for <br />known contaminants and procedures designed to account for potential hazards from known and/or suspected <br />substances. In preparing this document, Partner has specifically reviewed Occupational Safety & Health <br />Administration (OSHA) Title 29 Code of Federal Regulations (CFR) 1910 & 1926, California Occupational Safety <br />& Health Administration (Cal/OSHA) Title 8 California Code of Regulations (CCR) 5192, the National Institute of <br />Occupational Safety & Health (NIOSH)/OSHA/United States Coast Guard (USCG)/Environmental Protection <br />Agency (EPA) Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities, NIOSH <br />Pocket Guide to Chemical Hazards, and the American Conference of Governmental Industrial Hygienists, Inc. <br />(ACGIH) Threshold Limit Values for Chemical Substances and Chemical Agents. <br />Project Information <br />Project Type: <br />Site Name: <br />Address: <br />Partner Project Number: <br />Project Scope of Work <br />Phase II ESA <br />604 and 606 West 1 lth Street <br />Tracy, California 95376 <br />17-186468.2 <br />Phase II ESA that will include a GPR survey followed by direct push drilling in 5 locations. Soil and groundwater <br />samples will be taken and analyzed. <br />Utility Clearance <br />Have necessary underground utility notifications for subsurface work been made? Z Yes El Not Applicable <br />Specify clearance dates, ticket confirmation number, and other relevant information: <br />(Will obtain by 7/12/2017) <br />Partner Site-Specific Health and Safety Plan Page! <br />Version 1.02 July 6,2017
The URL can be used to link to this page
Your browser does not support the video tag.