My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GOLDEN VALLEY
>
0
>
2900 - Site Mitigation Program
>
PR0542125
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2021 2:01:14 PM
Creation date
6/1/2021 1:50:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0542125
PE
2965
FACILITY_ID
FA0024196
FACILITY_NAME
CONSOLIDATED TREATMENT FACILITY
STREET_NUMBER
0
STREET_NAME
GOLDEN VALLEY
STREET_TYPE
PKWY
City
LATHROP
Zip
95330
APN
19121008 19122013
CURRENT_STATUS
01
SITE_LOCATION
GOLDEN VALLEY PKWY
P_LOCATION
07
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE MITIGATION PROGRAM CHECKLIST <br />SITE LOCATION: Cr., ( A 4...A \iT tAk e,,,i C 64,,,r0.1 I I) ,e, <br />FAtt: ct:1 1.-Li i qv I6R# 0S-1-( .2&v AktiC <br />DATE ACTIVITY INITIAL <br />Review submittal and make sure all documents/fees have been submitted. <br />Request documents/fees not submitted. <br />Provide MFR to Accounting to ensure project has a FA# and a PR/f. The PR# for a <br />agency changes, a new PR# must be created under project does not change. If the lead <br />the existing FA. <br />S I t 1 1'1 <br />Issue SR for Work Plan Review — Enter the data into the SR form in EC making sure <br />L- x <br />to link the SR to the related FA. Generate an SR# and document on the permit form. If <br />no permit form has been submitted, record the information on a golden rod Service <br />Request form. Use this SR# on your DAR to track time spent obtaining documents/ <br />fees, reviewing work plan, issuing permits, coordinating field work activities, reviewing <br />subsequent report/sample results, making notifications/referrals. <br />Ott h 1 Work Plan SR#: 0 0 1(1cO CCO <br />Review Work Plan to ensure scope of work matches the scope of work approved by <br />construction/destruction meets SJC Ordinance Code the lead agency and that the mw <br />and well standards. <br />1.,,L 111 <br />' <br />Issue Permits - Enter permit information into SR form in EC, link to the FA# for the <br />this SR# on DAR to track time spent in the field for the <br />on the permit. <br />L Al project, and obtain an SR#. Use <br />specific mw/boring activity specified <br />'( )1- il 11 '571:1#: 'riJ c 00)114.0 <br />Scope: CL-5f -41 Mo ,, A-of ,t,t I % Am---4 i v- L f\ <br />6 ti n SR#: . i we 00 *5 1 1-kt Scope: (0 o cA'a ( vIC tk w v\*,0 i L. <br />SR#: Scope: <br />SR#: Scope: <br />SR#: Scope: <br />After scope of work on the well and boring permit SRs are complete, update the <br />following fields in the Service Request Approval Dates section of the SR form in EC: <br />Plan Status — choose 'Finaled'; Final Inspection — enter date permit finaled. <br />After all field work is complete, flag calendar to follow up on report of findings. <br />Report Review: <br />Projects -Review report to determine if <br />present, print out a 5021 and request a <br />2960. Provide 5021 to Accounting Office for <br />65 Notification. Send notification letter to CVRWQCB. <br />-Review report to determine next phase of work to <br />appropriate. Complete Prop 65 for any new <br />-Review report to determine if any immediate public <br />health concerns are found, notify supervisor <br />further notifications. Complete Prop 65 for any new <br />Environmental Assessment <br />contamination was found. If contamination <br />new PR# be issued under PE <br />processing. Complete a Prop <br />EHD Lead Oversight Projects <br />be conducted or if closure is <br />contaminants found at the site. <br />Other Lead Agency Projects <br />health issues are found. If public <br />immediately for follow up and <br />contaminants found at the site. <br />, After scope of work for the project SR is complete, update the following fields in the <br />Service Request Approval Dates section of the SR form in EC: Plan Status — choose <br />'Finaled'; Final Inspection — enter date work finalized.
The URL can be used to link to this page
Your browser does not support the video tag.