My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILCOX
>
2478
>
2200 - Hazardous Waste Program
>
PR0544840
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 9:04:11 AM
Creation date
6/1/2021 3:56:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0544840
PE
2220
FACILITY_ID
FA0025483
FACILITY_NAME
STOCKTON PROPELLER INC
STREET_NUMBER
2478
STREET_NAME
WILCOX
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
2478 WILCOX RD
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
837
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MUNICIPAL UTILITIES DEPARTMENT <br /> REGIONAL WASTEWATER CONTROL FACILITY <br /> CM- 01 <br /> 2500 NAVY DRIVE (209) 937.8750 PHONE <br /> r: <br /> STOCKTON STOCKTON, CA 95206 (209) 937.8702 FAX <br /> WASTEWATER DISCHARGE PERMIT <br /> PART C - SCHEMATIC FLOW DIAGRAM <br /> Purpose -The Schematic Flow Diagram shows the flow pattern of products through the facility and the <br /> various sources of wastewater. This information will enable the City of Stockton to assess the quality, <br /> volume, and peak flows of the discharge. <br /> Schematic Flow Diagram - For each major activity in which wastewater is generated, draw a diagram of <br /> the flow of materials and water from start to completed product, showing all unit processes generating <br /> wastewater. Number each unit process having discharges to the community sewer. Use these numbers <br /> when showing this unit process in the building layout in Part D. <br /> 3Lln,e t., c� 'S71G SonA ETQ1 <br /> gLaot c T�imlc Ac�n �� Scpnf- 5"YJTt— <br /> gto� Cx-s-S fuNstno w I i <br /> pfll,,4 <br /> b`(e Ac _ <br /> Det G e-rs w twat W ks tt — R v� Wa-rets GFs 7`0 <br /> IS 0P-Nr) w (-I�A <br /> Cit'�Pi2t^Sse� Rim <br /> I AI,eOtrJt ILJ� �' <br /> I I <br /> I dU+nr G.r'TS �IPv�"n r� �i.ou�r`rETR►�'L <br /> 6lROF C � ��DRr� rf1 Whit — Nk. — 1��s� WAT6t S Au.oAPO <br /> 70 E`JhPoRk7e <br />
The URL can be used to link to this page
Your browser does not support the video tag.