Laserfiche WebLink
SITE MITIGATION PROGRAM CHECKLIST - <br />PAM <br />SITE LOCATION: /2.,4 jr il640414 AL. , <br />00 -at 2,,, VpR# 4 z2.. 4 1 <br />li <br />,1 <br />.-zji 6 0 <br />TE Al ACTIVITY INITIAL <br />VI Review submittal and make sure all documents/fees have been submitted. <br />Request documents/fees not submitted. <br />7 <br />Provide MFR to Accounting to ensure project has a FA# art a PR#. The PR# for a <br />agency changes, a new PR# must be created under project does not change. If the lead <br />the existing FA. <br />9 0 <br />Issue SR for Work Plan Review - Enter the data into the SR form in EC making sure <br />on the permit form. If <br />on a golden rod Service <br /> obtaining w <br />activities, <br /> documents! <br />reviewing <br /> <br />to link the SR to the related FA. Generate an SR# and document <br />no permit form has been submitted, record the information <br />form. <br /> work <br />Use <br />plan, <br /> <br />fees, <br />Request this <br /> S R issuing permits, <br />DA R to <br />coordinating <br />track time spent <br />field <br /> <br />reviewing <br />souni yourng <br />subsequent report/sample results, making notifications/referrals. <br />Work Plan SR#: 0-07V/ nā€” ā€” <br />J . <br />Review Work Plan to ensure scope of work matches the scope of work approved by <br />construction/destruction meets SJC Ordinance Code the lead agency and that the mw <br />and well standards. <br />Issue Permits - Enter permit information into WP form in EC, link to the FA# for the <br />WP# on DAR to track time spent in the field for the <br />on the permit. , <br />project, and obtain a WP#. Use this <br />specific mw/boring activity specified <br />WP#I9 0 3730 ei Scope: ā€” , <br />-S- 120- CN-3/3 -S P So 41 r <br />WP#: Scope: <br />WP#: Scope: <br />WP#: Scope: <br />WP#: Scope: <br />After scope of work on the well and boring permit WPs are complete, update the <br />following fields in the Well Permit Approval Dates section of the WP form in EC: Plan <br />Status - choose Finaled'; Final Inspection - enter date permit finaled. <br />After all field work is complete, flag calendar to follow up on report of findings. <br />Report Review: <br />Projects -Review report to determine if <br />present, print out a 5021 and request a <br />2960. Provide 5021 to Accounting Office for <br />65 Notification. Send notification letter to CVRWQCB. <br />-Review report to determine next phase of work to <br />appropriate. Complete Prop 65 for any new <br />-Review report to determine if any immediate public <br />health concerns are found, notify supervisor <br />further notifications. Complete Prop 65 for any new <br />Environmental Assessment <br />contamination was found. If contamination <br />new PR# be issued under PE <br />processing. Complete a Prop <br />END Lead Oversight Projects <br />be conducted or if closure is <br />contaminants found at the site. <br />Other Lead Agency Projects <br />health issues are found. If public <br />immediately for follow up and <br />contaminants found at the site. <br />After scope of work for the project SR is complete, update the following fields in the <br />Service Request Approval Dates section of the SR form in EC: Plan Status - choose <br />`Finaled'; Final Inspection - enter date work finalized. <br />EHD-29 8/15/17 <br /> Site Mitigation Program Checklist