Laserfiche WebLink
AdvancedGeo <br />Environmental <br />25 April 2017 <br />AGE-NC Project No. 97-0301 <br />Page 6 of 6 <br />3.2. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT <br />Prior to use, all sampling tools used for sample collection will be thoroughly rinsed with <br />clean water after being washed with a solution of Alconox. Any soil waste generated <br />during field activities will be containerized in properly labeled DOT-approved 55-gallon <br />drums, and stored on-site in an area lacking general public access. Disposal alternatives <br />will be evaluated based on results of soil and water analysis. <br />3.3. REPORTING <br />Reporting of the site assessment and the soil-vapor investigation will be included in a <br />combined report. The report will include a description of work performed and the results <br />of soil and soil-vapor sampling. Conclusions and recommendations will also be included <br />in the report. The report will be in a format acceptable to CVRVVQCB guidelines, and will <br />be reviewed and signed by a California Professional Geologist.