My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2022 9:57:45 AM
Creation date
6/7/2021 8:08:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />_6._OVERFILL PREVENTION EQUIPMENT DETAILS <br />Tank ID (one OPE per column)Ti T2 fl <br />Are both vent and tank riser piping /Yes Yes Yes Yes <br />secondarily contained?No No No No <br />OPE Model Veeder Root Veeder Root Veeder Root <br />What is the OPE response when activated?Shut off Shut off Shut off Shut off <br />(Check all that apply.)Flow Flow Flow Flow <br />Ejestricts Eestricts Restricts EjRestricts <br />Flow Flow Flow Flow <br />ZAudible ZAudible Audible ElAudible <br />Alarm Alarm Alarm Alarm <br />ZVisual 7jVisual 7jVisual Visual <br />Alarm Alarm Alarm Alarm <br />Are flow restrictors installed on vent piping Yes*JYes* <br />that may interfere with the OPE operation?No No No No <br />At what level in the tank is the OPE set to <br />77w 77”77wactivate?(Inches from bottom of tank) <br />What is the percent capacity of the tank at <br />90%90%90%which the OPE activates? <br />Is the OPE in proper operating condition to /jYes jYes 7Yes JYes <br />respond when the stored substance No No No No <br />reaches the designated regulatory level? <br />7.SUMMARY OF TESTING RESULTS <br />/Pass /Pass /Pass PassOPEInspectionResultsFailFailFailFail <br />8.COMMENTS <br />Describe all results marked “Fail”and each proposed remedy. <br />*Mark here if: <br />Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additional copies of this page may be attached. <br />Attach tank chart(s),measurements,calculations,and In-Tank Setup report(s) <br />Page 2 of2
The URL can be used to link to this page
Your browser does not support the video tag.