Laserfiche WebLink
Engineered Septic System Report Irerracon <br />Cherokee Memorial Funeral Home and Offices ■ Lodi, California <br />March 10, 2021 ■ Terracon Project No. NA207102 <br />4.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION <br />4.1 Septic System Design Parameters <br />The following table presents the design parameters for the septic system: <br />Septic Tank Design Parameters <br />New Septic Tank = Base Tank Capacity (BTC), plus Average Daily Flow (ADF) <br />Calculations: Minimum (BTC) = 1,200 gallons <br />25 permanent employees, 100 visitors per day <br />(ADF) = 25 employees x 13 gpd + 100 visitors x 2 gpd = 525 gallons <br />Required Septic Tank Size = 1,200 + 525 = 1,725 gallons <br />Minimum Recommended Tank Size: (1) 2,000 gallon tank <br />Disposal Field Design Parameters <br />Soil Type (table 9.7.2): Sand or Sandy Loam <br />Soil Factor: 0.200 <br />1,200 gal BTC + 525 gal ADF = 1,725 gallons <br />Required Leach Line: 1,725 x 0.200 = 345 lineal feet (LF) of leach line <br />Suggested new leach field layout: Install four (5) leach lines with a length of 70 feet. <br />(345 LF/5 lines = 70 LF per line) <br />New Septic Tank Volume: New 2,000 gallon monolithic septic tank with solid <br />pump chamber baffle and (2) Orenco P1005 <br />pump and duplex control panel'. Non -pressurized <br />system. Please see design sheets for more <br />details. <br />Pump Size Requirement: See attached pump curve. <br />' Mechanical Floats instead of mercury floats. <br />Please see the attached plans regarding further details of the septic system design and layout. <br />The embalming room and all of its receptacles shall not flow to into the engineered septic <br />system. All fluid from this room shall be diverted to an on-site storage tank for interval <br />pumping and off-site haul. The size of the tank has been coordinated with the client based <br />on 57.5 gallons per embalming with 300-400 embalmings a year. if each tanker can handle <br />3750 gallons per pick up, the tank should be pumped every other month and will be the <br />clients responsibility to coordinate pumping and off -hauling. <br />Responsive ■ Resourceful ■ Reliable 3 <br />