STATEMENT OF TIMELY AVAILABILITY OF WATER SUPPLY: <br />PROJECT WATER SUPPLY REQUIREMENTS: <br />The proposed project will be serviced from the MHCSD Water Treatment Plant (WTP) <br />that currently treats 12.5 million gallons per day (MGD). A detailed analysis has been <br />conducted to identify what the proposed project water supply demand needs are. Those <br />calculations are listed below: <br />Preliminary water demand calculations for the proposed development are estimated to <br />be as follows: <br />Water Use Without Conservation: 1,800 GPD/ Acre' <br />Water Use With Conservation: 1,600 GPD/Acrel <br />1,800 GPD/acre x 2.86 acres = 5,148 GPD Without Conservation <br />1,600 GPD/acre x 2.86 acres = 4,576 GPD With Conservation <br />' Table 3-5 of the 2016 Mountain House Master Plan Update, Limited and General <br />Industrial with and without Conservation <br />PROJECT WATER SUPPLY AVAILABILITY: <br />The required water supply demand are currently available from MHCSD's System, but <br />both water treatment and water storage capacity must be purchased from one of the <br />Mountain House Master Development firms. See attached Water Supply Capacity <br />Agreement between Pinnacle Ridge, LLC (Applicate) and Mountain House Investors, <br />LLC (Developer). <br />Refer to Plan for Services Section 9 for other Water Supply details. <br />PROJECT WATER SUPPLY IMPROVEMENTS: <br />A 12" PVC waterline was installed within the street right-of-way of Bethany Road that <br />services the existing Waste Water Treatment Plant (WWTP). A 12" water line stub was <br />installed to the property line of the subject parcel for future connection with the <br />construction of the WWTP waterline project. The proposed development will connect to <br />this stub for new 8-inch and 6-inch fire services, 2-inch domestic services, and 1-inch <br />irrigation service. District approved water meters, double detector check valves, and <br />other required appurtenances will also be installed.