My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014047
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BETHANY
>
0
>
2600 - Land Use Program
>
LAFC 24-20
>
SU0014047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 1:53:35 PM
Creation date
6/7/2021 1:50:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014047
PE
2688
FACILITY_NAME
LAFC 24-20
STREET_NUMBER
0
Direction
W
STREET_NAME
BETHANY
STREET_TYPE
RD
City
MOUNTAIN HOUSE
Zip
95304-
APN
20916009
ENTERED_DATE
4/2/2021 12:00:00 AM
SITE_LOCATION
0 W BETHANY RD
RECEIVED_DATE
4/1/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF TIMELY AVAILABILITY OF WATER SUPPLY: <br />PROJECT WATER SUPPLY REQUIREMENTS: <br />The proposed project will be serviced from the MHCSD Water Treatment Plant (WTP) <br />that currently treats 12.5 million gallons per day (MGD). A detailed analysis has been <br />conducted to identify what the proposed project water supply demand needs are. Those <br />calculations are listed below: <br />Preliminary water demand calculations for the proposed development are estimated to <br />be as follows: <br />Water Use Without Conservation: 1,800 GPD/ Acre' <br />Water Use With Conservation: 1,600 GPD/Acrel <br />1,800 GPD/acre x 2.86 acres = 5,148 GPD Without Conservation <br />1,600 GPD/acre x 2.86 acres = 4,576 GPD With Conservation <br />' Table 3-5 of the 2016 Mountain House Master Plan Update, Limited and General <br />Industrial with and without Conservation <br />PROJECT WATER SUPPLY AVAILABILITY: <br />The required water supply demand are currently available from MHCSD's System, but <br />both water treatment and water storage capacity must be purchased from one of the <br />Mountain House Master Development firms. See attached Water Supply Capacity <br />Agreement between Pinnacle Ridge, LLC (Applicate) and Mountain House Investors, <br />LLC (Developer). <br />Refer to Plan for Services Section 9 for other Water Supply details. <br />PROJECT WATER SUPPLY IMPROVEMENTS: <br />A 12" PVC waterline was installed within the street right-of-way of Bethany Road that <br />services the existing Waste Water Treatment Plant (WWTP). A 12" water line stub was <br />installed to the property line of the subject parcel for future connection with the <br />construction of the WWTP waterline project. The proposed development will connect to <br />this stub for new 8-inch and 6-inch fire services, 2-inch domestic services, and 1-inch <br />irrigation service. District approved water meters, double detector check valves, and <br />other required appurtenances will also be installed.
The URL can be used to link to this page
Your browser does not support the video tag.