Laserfiche WebLink
EXHIBIT A <br /> WASTEWATER DISCHARGE PERMIT APPLICATION,CITY OF LODI <br /> PAGE 6 <br /> I. Schematic Flow Diagram and Building Layout: <br /> 1. Schematic Flow Diagram: For each major activity in which wastewater is generated, draw a <br /> diagram of the flow of materials, water, and wastewater from start to completion of the activity. <br /> Number each unit process having discharges to City sewers. Use these numbers when showing <br /> this unit process in the building layout, part 1.2. <br /> NN <br /> _--- , <br /> T Y' ti SIGNAGE PiA�: Eb <br /> � <br /> C:\Users\snord\AppData\Local\Microsoft\Windows\Temporary Internet <br /> Files\Content.Outlook\GZQYKWNA\Blank PERMAP.DOC <br />