Laserfiche WebLink
3[SJCOG, <br />Inc. <br />S J C O G, Inc. <br />San Joaquin Collfl Multi -Species Habitat Consel Dation e�� Open Space Plan <br />555 East Weber Avenue • Stockton, CA 95202 • (209) 235-0600 • FAX (209) 235-0438 <br />SJMSCP HOLD <br />TO: Local Jurisdiction: Community Development Department, Planning Department, Building <br />Department, Engineering Department, Survey Department, Transportation Department, Public <br />Works Department, <br />Other: <br />FROM: Laurel Boyd, SJCOG, Inc. <br />`� � NOT AUTHORIZE SITE DISTURBANCE <br />DO RIOT ISSUE A BUILDING PERMIT <br />FOR THIS PRO_; <br />The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi - <br />Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that agreement, the <br />Applicant has agreed to: <br />1) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br />1. Incidental Take Minimization Measures (ITMMs) will be issued to the project and must be signed by the <br />project applicant prior to any ground disturbance but no later than six (6) months from receipt of the ITMMs. <br />If ITMMs are not signed within six months, the applicant must reapply for SJMSCP Coverage. Upon receipt <br />of signed ITMMs from project applicant, SJCOG, Inc. staff will sign the ITMMs. This is the effective date <br />of the ITMMs. <br />2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br />3. Upon issuance of fully executed ITMMs and prior to any ground disturbance, the project applicant must: <br />a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br />being covered (the bond should be valid for no longer than a 6 month period); or <br />b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered; or <br />c. Dedicate land in -lieu of fees, either as conservation easements or fee title; or <br />d. Purchase approved mitigation bank credits, <br />4. Within 6 months from the effective date of the ITMMs or issuance of a building permit, whichever occurs <br />first, the project applicant must: <br />a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered; or <br />b. Dedicate land in -lieu of fees, either as conservation easements or fee title; or <br />c. Purchase approved mitigation bank credits. <br />Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called, <br />Project Title: PA -2100074 (MS) <br />Landowner: Willard C. &Laverne Collins Trust <br />Assessor Parcel #s: 121-100-61 <br />T , R , Section(s): <br />Local Jurisdiction Contact: Giuseppe Sanfilippo <br />Applicant: Wong Engineers, Inc. <br />The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br />Incidental Take Minimization Measures are properly implemented and monitored and that <br />appropriate fees are paid in compliance with the SJMSCP. <br />