Laserfiche WebLink
Rev 1 <br />SITE IMPROVEMENT PLAN <br />STOCKTON METROPOLITAN AIRPORT <br />SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br />1810 E. HAZELTON AVENUE, STOCKTON CA 95205 <br />BUSINESS PHONE: (209) 468-3121 <br />Business Hours: 8:00 a.m. to 5:00 p.m. (Monday through Friday) <br />APPLICATION PROCESSING STEPS <br />STEP 1 CHECK WITH STAFF -Development Services Staff will explain the requirements and procedures to you. <br />STEP 2 SUBMIT YOUR APPLICATION -When you apply, file all of the following: <br />•FEE <br />•FORM <br />•IMPROVEMENT <br />PLAN <br />•HAZARDOUS <br />MATERIALS <br />•PLAN <br />COMPLETE <br />The staff will let you know the current cost of filing a Site Improvement Plan. Make checks <br />payable to the San Joaquin County Treasurer. <br />Ten (10) copies of the completed information forms (attached) which all owners must sign. <br />Ten (10) copies of a Site Improvement Plan, 24" x 36" (see attached checklist and sample). <br />This is an engineered plan showing drainage, grading, access, on-and off-site service and <br />utility facilities, landscaping, circulation/parking details, etc. <br />One copy of a completed Hazardous Materials Disclosure Survey form (a copy of the form is <br />attached). <br />Staff will check your Site Improvement plan. If anything is missing, you will be notified. <br />(Your plan cannot be processed until it is complete.) <br />STEP 3 PROCESSING <br />•REVIEW AND <br />ACTION <br />•FINAL ACTION <br />Staff will route the Site Improvement Plan to the Stockton Metropolitan Airport Design Review <br />Committee (SMADRC). At the end of a review period the SMADRC will approve your Site <br />Improvement Plan if the plan conforms to the adopted Airport Special Purpose Plan. If the plan <br />needs to be modified, you will be so informed. <br />The action of the staff is final. If the Site Improvement Plan is found inconsistent with the <br />Airport Special Purpose Plan, you have three options; <br />1.Correct the inconsistencies and resubmit the application; <br />2.Apply for an Amendment to the Special Purpose Plan; or <br />3. Appeal the denial to the Planning Commission. <br />STEP4 REQUIREMENTS AND ADDITIONAL PERMITS <br />•REQUIREMENTS <br />•DRIVEWAY <br />PERMITS <br />•BUSINESS <br />LICENSES <br />•BUILDING <br />PERMITS <br />The staff will advise you of the final action and list requirements, by department, that must be <br />met before you can start your project. <br />Driveway Permits must be acquired from the Public Works Department for any work <br />performed within the road right of way. If the project fronts on a state highway these permits <br />are obtained from Caltrans. <br />If the project involves a business, a Business License must be approved prior to starting <br />operation. Business License applications can be processed concurrently with the Site <br />Improvement Plan. <br />If the project involves construction a building permit must be approved prior to commencement <br />of work. <br />F:\DEVSVC\Planning Application Forms\Site Improvement Plan. <br />Stkn Airport.doc (Revised 08-26-09) <br />Page 1 of 8 <br />PA_2100081 (IP)