Laserfiche WebLink
a <br />ARCHITECTS ENOIIIEERS <br />April 26, 2021 <br />San Joaquin County <br />Community Development Department <br />Stockton, CA <br />ATTN: Megan Aguirre, Senior Planner <br />RE: Atlantic Aviation Tenant Improvement <br />Statement of Conformity <br />Dear Ms. Aguirre, <br />The letter is to inform the San Joaquin County of the scope of our project and our understanding of the items <br />that are required to be provided per the site improvement checklist provided to us by Community Development. <br />The Proposed Atlantic Aviation project consist of very minor site improvements consisting of an addition of 468 <br />SF for Line Service, 235 SF Airside Entry Vestibule and Canopy, and 67 SF Land Side Entry Canopy. The <br />total added SF for improvement is 770 SF. The existing permitted area between existing hangar and office is <br />83,389 SF. The following are response to the items within the checklist for Statement of conformity: <br />•Over site planning-JRMA has provided vicinity plan, over all site identification plan, and over all <br />project site plan to include existing parking and immediate are surrounding the project. It is our <br />understanding that this project is situated on land leased from the Stockton Metropolitan Airport and all <br />existing buildings, site, and public works conditions have been met at the time original project was <br />built. <br />•Off-site and on-site vehicle circulation-vehicle circulation for the site will not change form <br />previously approved plans. This project will not impact any of the existing circulation design on either <br />landside or airside. <br />•Parking-per the current planning requirements, the existing onsite parking is adequate and will not <br />need to be modified based on the proposed additions of 770 SF to the project. JRMA will add some <br />dimensioning to existing parking as requested to show over all clearances. It is our understanding that <br />the impact of our project will not require us to address any new requirements. <br />•Transit Stops-Due to the scope of our project our view is to keep the focus on our project and the <br />immediate areas affected within the property as shown on our site plan. Our understanding is that any <br />transit items have been addressed on previous permits. <br />•Signage-Any new signage will be provided under separate permits. <br />•Lighting-All sight lighting is to remain except for minor additions of wall packs on the existing building. <br />Sincerely, <br />J.R. MILLER & ASSOCIATES, INC. <br />Architects and Engineers <br />Miguel Ibarra <br />Project Manager <br />PAGE l