Laserfiche WebLink
Baker, Lydia [EHD] <br /> From: Abed Alajarmeh <abed@casynergy.com> <br /> Sent: Friday, June 4, 2021 9:49 AM <br /> To: Baker, Lydia [EHD]; mohammad tahir hussaini <br /> Subject: Re: Return to Compliance <br /> Attachments: 2020 TRAINING - SYNERGY - CENTRAL GAS - PACIFIC - 8-28-20.pdf; SYNERGY MOES - <br /> TRANING - 6-3-21.pdf <br /> CAUTION:This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe. <br /> Lydia, <br /> please find attached the DO training sheets for 6131 Pacific Ave <br /> On Thu, Jun 3, 2021 at 11:56 AM Baker, Lydia [EHD] <1baker(a sj og v.org> wrote: <br /> Hello Abed, <br /> Can you send me a copy of the last DO training certification not the report? <br /> For the filters a deflector plate is usually installed to take care of that. No permit is required for that. Here are the <br /> requirements: <br /> 1. Provide 48-hours written notification to ust@sigov.org for repair or testing <br /> 2. The component must be tested after repair/installation to verify functionality. <br /> 3. The service company must provide the following documentation to the tank owner/operator for onsite review by <br /> an inspector during annual UST inspection. <br /> a. Description of part(s) installed (parts list, cut sheets, etc.) <br /> b. Proof of current ICC and manufacturer certifications for individual performing the work <br /> c.Testing documentation to verify functionality of the component after repair <br /> 4. All required components must be tested within 30 days of repairs. Test results must be submitted to <br /> EHD within 30 days. <br /> 1 <br />