Laserfiche WebLink
TABLE OF CONTENTS <br />PLAN APPROVAL IV <br />HEALTH AND SAFETY PLAN SUMMARY V <br />1.0 INTRODUCTION 1 <br />1.1 PLAN USE AND APPLICABILITY 1 <br />1.2 GENERAL BACKGROUND AND OBJECTIVES 2 <br />2.0 INTRODUCTION 3 <br />2.1 PROJECT LOCATIONAND DESCRIPTION 3 <br />2.2 PROJECT BACKGROUND 3 <br />2.3 PLANNED SCOPE OF SERVICES 3 <br />2.4 PROJECT SCHEDULE 3 <br />3.0 ADMINISTRATIVE REQUIREMENTS/CONTROLS 4 <br />3.1 PERSONNEL 4 <br />3.1.1 Project Manager 4 <br />3.1.2 Site Health and Safety Officer/Foreman 4 <br />3.1.3 Health and Safety Professional 5 <br />3.1.4 Project Field Staff 5 <br />3.2 PERSONNEL TRAINING 6 <br />3, 2,1 General Site Employees 6 <br />342,2 "Tailgate" Meetings 6 <br />3.3 MEDICAL SURVEILLANCE 6 <br />4.0 HAZARD AND CON'T'ROL ANALYSIS 8 <br />4.1 MECHANICAL HAZARDS 8 <br />4.1.1 Material Handling/Back Strain Hazards 8 <br />4.1.2 "Striking" Hazards 9 <br />4.1.3 "Strcrck-by" Hazards 10 <br />COSTERA WASTE &ENVIRONMENTAL, INC. 1 MAY 4, 2021 <br />