Laserfiche WebLink
CERS ConWhdated Ernergenc) Response i Contingency flan <br /> INTERNAL FACILITY EMERGENCY CONIMUNiCAT1ONS OR ALARA{NOTIFICATION WILL OCCUR BY(Check all that apply} <br /> cli <br /> l VERBAL WARNINGS. ❑2 PUBLIC ADDRESS OR INTERCOM SYSTEM; 3 TELEPHONE: <br /> ❑4 PAGERS; ❑5.ALARM SYSTEM: ❑b.PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAYBE AFFECTED BY AN OFF SITE RELEASE WILLOCCUR BY(Check all that apply). t'- <br /> ❑I.VERBAL WARNINGS, ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM, ©3.TELEPHONE; <br /> ❑4_PAGERS; ❑5-ALARM SYSTEM; ❑6 PORTABLE RADIO <br /> C13. <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: <br /> PRIMARY EMERGENCY COORDINATOR NAME: (�"14V(4 ia'o(�,�+t PHONE NO.: glf,0I 6SSZarPHONE NO.. <br /> � <br /> ALTERNATE EMERGFNCY COORDINATOR NAME. >vL-4�arA PHONE NO.: 9>a O$3APHONE NO.: <br /> ❑Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br /> Note:If more than one alternate emergency coordinator 1s designated,attach a list in order of respotimbtlity. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicabeboxestoindicaleyour facility's procedures for containin ills and rel entin and mitt sting releases,fires andlor ex lesions- `ri <br /> IMI. NJONETOR FOR LEAKS,RUPTURES,PRESSURE BUILD-UP,ETC.; <br /> 02. PROVIDE STRUCTURAL PHYSICAL BARRIERS(e.g.,Portable spill containment walls,built-in berms); <br /> ❑3. PROVIDE ABSORBENT PIJYS1CAL BARRIERS(e.g.,Pads.spill pigs,Will pillows); <br /> (X 4. COVER OR BLOCK FLOOR ANDIOR STORM DRAINS. <br /> ❑S. LINED TRENCH DRAINS ANDIOR SUMPS, <br /> [:16 AUTOMATIC FIRE SUPPRESSION SYSTEM. <br /> 7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> (�S. STOP PROCESSES AND OR OPERATIONS; <br /> 9. AUTOMATIC i ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> 10_SHUT OFF WATER.GAS,ELECTRICAL UTILITIES: <br /> 11,CALL 9-1-1 FOR PUBLIC EMFRGENCY RESPONDER ASSISTANCE ANIDIOR MEDICAL AID; <br /> 12.NOTIFY AND EVACUATE PERSONS IN ALL THREATENED ANID+OR IMPACTED AREAS: <br /> 13.ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION, <br /> ❑14.PROS IDE PROTECTIVE EQUIpMENT FOR ON-SITE EMERGENCY RESPONSE TEAM, <br /> ❑15.RENJOVE CONTAINI=RS ANWOR ISOLATE AREAS; <br /> 16.HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> 17.USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> 18,VACUUM SUCTION USING APPROPRIATE VACUUM(e.g.,Intrinsically safe)FOR SPILL CONTROL AND-OR CLEANUP; <br /> TNEL AND❑ 19.PROVO <br /> DSAS FNATE PERSONE TEMPORARY STORAGE OF 1IAZARDO S WASTE GENERATED DURING EMERGENCY ACTIONSEUIPMENT WITHIN DESlCjNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> D2- <br /> g2I OTHER(Specify): <br /> E. FACILITY EVACUATION <br /> El. I <br /> FF-:.F::�',ISNG�ALAP-'A�S,I.GNAL(�SI OLLOWILL BE USED TO BEGIN EVACUATION OF THE FACILITY(Check all that apply): � III1 <br /> 1. BELLS;2HORNSIIRENS.3. VERBA (i.e.,Shouting <br /> []4. OTHER(S eeifv): <br /> 711£FOLLOl%'ING LOCATIONS)WILL BE USED FOR.AN EMERGENCY ASSEMBLY AREA(S)(C,9,Parking,h-t.+meet wrner). <br /> PARui� AreA b1 6 r .- ciy% <br /> Note:The Emcr en Coordinator must account for all onsite em to es and visitors after evacuation. E4 <br /> EVACUATION ROUTE 5 AND ALTERNATE EVACUATION ROUTES ARE DESCRIQED AS FOLLOWS: <br /> ❑1.WRITTEN PROCEDURES DESCRIBING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> [12,EVACUATION MAPS)DEPICTING ROUTES.EXITS,AND ASSEMBLY AREAS, Es <br /> ®3. OTHER(Specify): M*? V&MAL► <br /> Note:Evacuation Procedures and�ar maps should be posted in risible facility locations and must be included in the Contingency Plan, <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> fl <br /> F1. 4AVE <br /> RRANGEMENTS FOR LOCAL EMERGENCY SERVICES(Check one or the following): <br /> BEEN DETERMINED NOT NECESSARY; fl- <br /> THE <br /> =THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE(Specify): <br /> Note:Advance arrangements with local fire and police departments,hospitals,elate and 10ca1 emergency response teams,andlor emergency sen ices <br /> contractors should be made for your facility,if necessary. Large Quantity Generators must describe arrangernents in the Contittgericy Plan. <br /> Ile..o3)a7r 17 Page 2 of 4 <br />