My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1987-1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_1987-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2023 1:55:27 PM
Creation date
6/10/2021 2:46:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1987-1991
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Landfill Gas Monitoring and Control <br />30. Does the landfill have a gas monitoring network? <br />YES NO X (To be installed) <br />If NO, <br />a. What will be the spacing between probes? 1000 ft. <br />b. What criteria was used to select this spacing? <br />Site remoteness and adjacent land use is agricultural <br />C. Total footage for gas probes. 35 <br />Notes Depth of probes should equal at least 1 x depth <br />of refuse within 1,0001. <br />d. Probe intervals per boring. 7 feet <br />Suggested Minimum: <br />1) Surface (5-10 ft) <br />2) Intermediate (half the depth of boring) <br />3) Deep (to depth of boring) <br />e. Cost of design $ 0 <br />f. Cost of drilling, materials $ 7,200 <br />g. Cost of installation $ 7,200 <br />h. Subtotal for monitoring network $ 14,400 <br />(Line 30e + Line 30f + Line 30g) <br />If YES, <br />i. How many probe installations are in place? <br />j. What is the lateral spacing between probe <br />installations? <br />k. What is the number of probe intervals per boring? <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.