My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1987-1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_1987-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2023 1:55:27 PM
Creation date
6/10/2021 2:46:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1987-1991
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drainage <br />i <br />51. How often do you anticipate the need to perform maintenance <br />activities (e.g., clear material from runoff surface water <br />conveyances, minor grading,. repair of articulated drains; <br />also problems with runon maintenance and repair of levees, <br />dikes, protective berms)? For example, after major storms, <br />before the rainy season or quarterly. <br />a. Annual maintenance costs ($/yr) 8,400 <br />Security <br />52. What are the estimated annual maintenance costs to <br />repair/replace fencing, gates, locks, signs, and/or other <br />security equipment at the landfill site? <br />Inspection ($/yr ) 300 <br />53. What will be the routine maintenance inspection frequency of <br />the landfill during postclosure (minimum semi-annually)? <br />Quarterly & Annual <br />a. Inspection unit cost $ 500 <br />b. Annual inspection costs during the postclosure care <br />period? <br />($/yr) 2,500 <br />Components that should be inspected include, but are not <br />limited to: <br />o Final cover - erosion damage <br />o Final grading - ponding caused by settlement <br />o Drainage control systems - continuity of articulated <br />drains, sediment choked conduits <br />o Gas collection/control systems <br />o Leachate collection and treatment systems <br />effectiveness, and continuity <br />o Security - fences, gates and signs <br />o Vector and fire control <br />o Monitoring equipment <br />o Litter control <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.