Laserfiche WebLink
Construction Monitoring <br /> Construction activities shall be monitored in the landfill and mitigation area to ensure <br /> that protected wetlands are avoided, sediment barriers jis designed to protect effective, and ez ting <br /> tion of <br /> wetlands is minimized. The construction monitoring program <br /> wetlands and other habitats against disturbance and to monitor construction activities _ <br /> associated with implementation of the mitigation plan. <br /> Monitoring of Landfill Construction <br /> The biological monitor shall monitor landfill construction activities to the extent <br /> necessary to prevent adverse impacts on wetlands and other sensitive biological resources <br /> identified in the mitigation plan. The biological lmonitor i are to be work with <br /> andthe tto rev ew <br /> ineer <br /> and construction foreman onsite to determine which areas <br /> the construction schedule. No wetlands or other biological resources identified in the plan <br /> shall be disturbed without approval by the biological monitor. <br /> Monitoring of Mitigation Area Construction <br /> All activities associated with construction of wetlands rescri trl in the <br /> mitigatiieson <br /> plan shall be monitored continually by the biological mo <br /> itor. Nothe mitigation area shall be permitted without the bnooiogiclmonitor The biological monitor <br /> biological monitor determines that his/her presence <br /> shall consult the project engineer and construction foreman as tbiologi grading <br /> l monitor sha 1 <br /> within the mitigation area to achieve the intendedresults. <br /> document the grading activities and report to the County. <br /> Postconstruction Performance Standards and Remedial Actions <br /> i The goal of the mitigation plan is to achieve no net loss of wetlands area or <br /> ecological value in the project area. To that end, the mitigation plan specifies creating <br /> wetlands at ratios greater than 1:1 for each habitat type to allow for some failures in <br /> wetlands creation. The performance standards are therefore designed to allow for a <br /> measured amount of mitigation failure while still achieving no <br /> net loss <br /> laby the <br /> If <br /> performance standards are not met, then remedial actions shallprescribe <br /> biological monitor. The prescribed remedial action(s) shall be completed in a timely <br /> manner by the County or its agent. <br /> 50 <br /> i <br />