My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1987-1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_1987-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2023 1:55:27 PM
Creation date
6/10/2021 2:46:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1987-1991
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Tom Horton Aak Project 939-02.22 <br /> February 2, 1990 1P <br /> Page 12 <br /> COST ESTIMATE <br /> The following budgetary estimate of construction costs for proposed buildings <br /> and infrastructure was developed to assist in the facility planning effort. Costs for <br /> materials processing equipment were not included. The costs provided <br /> correspond to the proposed development shown on Figure 1. <br /> Budgetary Cost Estimate <br /> North County Sanitary Landfill <br /> Preliminary Entrance Facilities <br /> Item Budgetary Cost Estimate <br /> Sorting Building $1,070,000 <br /> Maintenance/Office Building 398,000 <br /> Scale Building 20,000 <br /> Scale and Computer 35,000 <br /> Fence 16,000 <br /> Asphaft Pavement 300,000 <br /> Gravel Surface 270,000 <br /> Landscaping 25,000 <br /> Water System(Well,Tank, Booster, Pump, Pipe) 400,000 <br /> Septic System(Septic Tank, Pump Station, <br /> Leachfield, Pipe, Manholes) 55,000 <br /> Earth Work 80,000 <br /> Electric Power Supply 50,000 <br /> Building Electrical 150,000 <br /> Exterior Lighting 50.000 <br /> Telephone Service 20,000 <br /> Sub-Total $212MO-0 <br /> 25 Percent Contingency <br /> and Engineering ±735,000 <br /> Total Budgetary Estimate $3..674000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.