Laserfiche WebLink
14 . r <br />o potential for changes in noise levels along Harney Lane between <br />Highway 99 and the existing Harney Lane Landfill associated with <br />altered landfill traffic patterns. <br />Land Use <br />o potential conflicts between the landfill operation and the rural res- <br />idential /agricultural uses that surround the site, <br />o consistency between the landfill plan and the County's general plan <br />and solid waste management plan, and <br />o conversion of grazing land to solid waste disposal use. <br />Public Services <br />o change in daily solid waste operations and costs associated with the <br />disposal site relocation, and <br />o potential for increased road maintenance, fire protection, police <br />services, and drainage control costs. <br />Transportation /Circulation <br />o changes in landfill -associated traffic patterns caused by disposal <br />site change, and <br />o need for modifications to Harney Lane to accommodate increasing <br />truck traffic. <br />Energy <br />o changes in fuel consumption rates associated with the relocation of <br />the landfill, and <br />o potential for methane gas collection and use at the new landfill site. <br />Human Health <br />o vector generation and associated health hazards at the new landfill <br />site, <br />o potential for bird attraction and subsequent flight hazard to <br />aircraft in the area, <br />o risk of explosion from landfill gas generation and migration around <br />the site; and <br />N <br />