Laserfiche WebLink
GSI Job No.: 4760 140 I V S 1 <br /> Issued: 15 November 2017 <br /> ENVIRONMENTAL <br /> TABLE OF • <br /> 1.0 INTRODUCTION ..............................................................................................................1 <br /> 2.0 INVESTIGATION OBJECTIVES.......................................................................................1 <br /> 3.0 SITE BACKGROUND, SETTING, AND DOMESTIC WELL SAMPLING..........................1 <br /> 3.1 Site Setting, Description and History....................................................................................2 <br /> 3.2 Geology and Hydrogeology..................................................................................................2 <br /> 3.3 Results of Recent Domestic Well Sampling.........................................................................3 <br /> 4.0 APPROACH AND RATIONALE FOR SAMPLING LOCATIONS.....................................3 <br /> 5.0 FIELD INVESTIGATION...................................................................................................4 <br /> 5.1 Site Health and Safety Plan..................................................................................................4 <br /> 5.2 Geophysical Survey and USA Notification...........................................................................4 <br /> 5.3 Soil Sample Collection Procedures......................................................................................5 <br /> 5.3.1 Soil Sample Collection ..............................................................................................5 <br /> 5.3.2 Sampling Packaging, Shipment, and Chain-of-Custody...........................................5 <br /> 5.3.3 Equipment Decontamination.....................................................................................5 <br /> 5.3.4 Equipment Calibration and Maintenance..................................................................5 <br /> 5.4 Soil Sample Analysis............................................................................................................5 <br /> 5.5 Soil Gas Sampling and Analysis...........................................................................................5 <br /> 6.0 QUALITY ASSURANCE AND QUALITY CONTROL ("QC) PROCEDURES ..............6 <br /> 7.0 DATA EVALUATION AND REPORTING.........................................................................6 <br /> 8.0 REFERENCES .................................................................................................................7 <br /> Figure 1 Proposed Sampling Locations <br /> Site Investigation Work Plan a <br /> Park Woods Cleaners <br />