Laserfiche WebLink
Type 11 Work Plan - Addendum <br />UXO Construction Activities and Soil Removal Action <br />Preliminary Assessment/Site Investigation Update <br />California Army National Guard Facility <br />Stockton, California <br />Contract No GS-00E-007L/Task Order W91238-05-F-0084 <br />Version 2.0 <br />Constituent Analytical <br />Methods <br />Container <br />Type Preservation Maximum <br />Holding Time t, <br />Polychlorinated <br />Biphenyls <br />(PCBs) <br />SW8082 <br />Glass jars with <br />septum or <br />brass tube <br />Teflon-lined 4°C 4°C <br />14 days until <br />then 40 <br />days after <br />extraction <br />Total <br />Petroleum <br />Hydrocarbons <br />(C6-C40) <br />SW8015M <br />Glass jars with <br />septum or <br />brass tube <br />Teflon-lined extraction, 4°C <br />14 days until <br />then 40 <br />days after <br />extraction <br />CAM 17 <br />Metals Various <br />Glass jars with <br />Teflon-lined <br />septum or <br />brass tube <br />4°C 1 80 days <br />Arsenic SW6010B <br />Glass jars with <br />Teflon-lined <br />septum or <br />brass tube <br />4°C 180 days <br />104700.4965.300 Page C FSP-9 April 2007