Laserfiche WebLink
Type 11 Work Plan - Addendum <br />UXO Construction Activities and Soil Removal Action <br />Preliminary Assessment/Site Investigation Update <br />California Army National Guard Facility <br />Stockton, California <br />Contract No. GS-00E-0071./Task Order W91238-05-F-0084 <br />Version 2.0 <br />9.0 REFERENCES <br />DoD Quality System Manual for Environmental Laboratories, rev2, 2002 <br />EM 200-1-3 Requirements for the Preparation of Sampling and Analysis Plans, 2001. <br />EM 200-1-6 Chemical Quality Assurance for HTRW Projects, 1997. <br />EPA 540/R-94/012 National Functional Guidelines for Organic Data Review, 1999. <br />EPA 540/R-94/013 National Functional Guidelines for Inorganic Data Review, 2002. <br />EPA QA/G-4HW Guidance for the Data Quality Objectives Process for Hazardous <br />Waste Sites, 2000. <br />EPA QA/G-5 EPA Guidance for Quality Assurance Project Plans, 2002. <br />EPA QA/G5S Guidance for Choosing a Sampling Design for Environmental Data <br />Collection, 2000. <br />EPA SW-846 Test Methods for Evaluating Solid Waste, Third Edition (including <br />published Updates), 1996. <br />104700.4965.300 Page C FSP-11 April 2007