Laserfiche WebLink
Soil Boring Results and VEG/ISCO Work Plan <br />Field Maintenance Shop #24, Stockton, California October 2016 <br />TABLE OF CONTENTS <br />1.0 INTRODUCTION 1 <br />1.1 SITE DESCRIPTION AND HISTORY 1 <br />1.2 SITE SETTING AND GEOLOGY 2 <br />1.3 REGIONAL AND SITE HYDROGEOLOGY 2 <br />2.0 SOIL CHARACTERIZATION STUDY 3 <br />2.1. SOIL SAMPLE RESULTS 3 <br /> <br />2.1.1. Soil Boring SB-4 4 <br /> <br />2.1.2. Soil Boring SB-5 4 <br /> <br />2.1.3. Soil Boring SB-6 4 <br />2.2. SOIL SAMPLE DATA FMS-MW6, FMS-MW7, FMS-MW8 5 <br />2.3. CONCLUSIONS 5 <br />3.0 REMEDIAL ACTION WORK PLAN 5 <br />3.1. WASTE DISCHARGE REQUIREMENTS AND PERMITTING 5 <br />3.2. VAPOR ENERGY GENERATOR TECHNOLOGY 6 <br /> <br />3.2.1. VEG Implementation Objectives 6 <br /> <br />3.2.2. Proposed VEG Scope 7 <br /> <br />3.2.3. VEG Soil Confirmation Sampling 7 <br />3.3. ISCO REMEDIAL MEASURE 8 <br /> <br />3.3.1. ISCO Treatment Objectives 8 <br /> <br />3.3.2. Proposed ISCO Injection Scope 8 <br /> <br />3.3.3. Post-ISCO Injection Monitoring 9 <br />3.4. SURVEYING 10 <br />3.5. INVESTIGATION DERIVED WASTE 10 <br />3.6. QUALITY ASSURANCE PLAN 11 <br /> <br />3.6.1. Field Quality Control Samples 11 <br />3.7. REMEDIAL ACTION REPORTING 11 <br />3.8. SCHEDULE 11 <br />4.0 REFERENCES 13 <br />Page i •