Laserfiche WebLink
Type II Work Plan - Addendum <br />UXO Construction Activities and Soil Removal Action <br />Preliminary Assessment/Site Investigation Update <br />California Army National Guard Facility <br />Stockton, California <br />Contract No. GS-00E-007L/Task Order W91238-05-F-0084 <br />Version 2.0 <br />TABLE OF CONTENTS <br />DISTRIBUTION LIST <br />PREFACE ii <br />LIST OF ACRONYMS AND ABBREVIATIONS iii <br />1.0 INTRODUCTION 1-1 <br />1.1 Site Location 1-1 <br />1.2 Site history 1-1 <br />1.3 Topography 1-3 <br />1.4 Climate 1-3 <br />2.0 TECHNICAL MANAGEMENT PLAN 2-1 <br />2.1 General 2-1 <br />2.2 Pre-characterization 2-2 <br />2.3 Buried Waste Excavation 2-3 <br />3.0 EXPLOSIVES MANAGEMENT PLAN 3-1 <br />4.0 EXPLOSIVES SITING PLAN 4-1 <br />5.0 GEOPHYSICAL PROVE-OUT PLAN AND REPORT, INCLUDING CONTRACTING <br />OFFICER APPROVAL LETTER 5-1 <br />6.0 GEOPHYSICAL INVESTIGATION PLAN 6-1 <br />7.0 GEOSPATIAL INFORMATION AND ELECTRONIC SUBMITTALS 7-1 <br />8.0 WORK, DATA, AND COST MANAGEMENT PLAN 8-1 <br />9.0 PROPERTY MANAGEMENT PLAN 9-1 <br />10.0 QUALITY CONTROL PLAN 10-1 <br />11.0 ENVIRONMENTAL PROTECTION PLAN 11-1 <br />12.0 INVESTIGATIVE DERIVED WASTE PLAN 12-1 <br />12.1 Investigative Derived Waste Plan 12-1 <br />13.0 INTERIM HOLDING FACILITY SITING PLAN FOR RCWM PROJECTS 13-1 <br />14.0 PHYSICAL SECURITY PLAN FOR RCWM PROJECT SITES 14-1 <br />15.0 REFERENCES 15-1 <br />104700.4965.300 Page -iv April 2007