My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
2422
>
2900 - Site Mitigation Program
>
PR0542474
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 11:01:20 AM
Creation date
6/11/2021 10:50:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0542474
PE
2950
FACILITY_ID
FA0024411
FACILITY_NAME
JWR - ELWOOD EQUITY PROPERTY
STREET_NUMBER
2422
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
16707030
CURRENT_STATUS
01
SITE_LOCATION
2422 S CALIFORNIA ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE MITIGATION PROGRAM CHECKLIST <br />SITE LOCATION: --v-it 2., S Ce frar,,,,wi 5,)- <br />FA#: I i <br />00 7-17 11/1 PR# 0 LS-4, Z' -7d. 471 CD ,S <br />DATE ACTIVITYfi ^ INITIAL <br />c -aitts Review submittal and make sure all documents/fees have been submitted. L----e <br />17/ Request documents/fees not submitted. <br />Provide MFR to Accounting to ensure project has a FA# and a PR#. The PR# for a <br />agency changes, a new PR# must be created under project does not change. If the lead <br />the existing FA. <br />/ <br />no <br />/ 5" I. <br />/ Y <br />Issue SR for Work Plan Review - Enter the data into the SR form in EC making sure <br />. <br />to link the SR to the related FA. Generate an SR# and document on the permit form. If <br />permit form has been submitted, record the information on a golden rod Service <br />Request form. Use this SR# on your DAR to track time spent obtaining documents/ <br />/fees, reviewing work plan, issuing permits, coordinating field work activities, reviewing <br />subsequent report/sample results, making notifications/referrals. <br />V <br />Work Plan SR#: Sd_.,00 7 c',..s."91J <br />/and <br />41( <br />Review Work Plan to ensure scope of work matches the scope of work approved by <br />construction/destruction meets SJC Ordinance Code the lead agency that the mw <br />, <br />/ 1)4( (.1 <br />Issue Permits - Enter permit information into WP form in EC, link to the FA# for the <br />WP# on DAR to track time spent in the field for the <br />on the permit. <br />project, and obtain a WP#. Use this <br />specific mw/boring activity specified <br />WP#: a 0.0 3 .7 77 j Scope: .s.4.3\ Auci‘... <br />tp----- <br />WP#: Scope: <br />WP#: Scope: <br />WP#: Scope: <br />WP#: Scope: <br />After scope of work on the well and boring permit WPs are complete, update the <br />following fields in the Well Permit Approval Dates section of the WP form in EC: Plan <br />Status - choose `Finaled'; Final Inspection - enter date permit finaled. <br />After all field work is complete, flag calendar to follow up on report of findings. <br />Report Review: <br />Projects -Review report to determine if <br />contamination present, print out a 5021 and request a <br />2960. Provide 5021 to Accounting Office for <br />65 Notification. Send notification letter to CVRWQCB. <br />-Review report to determine next phase of work to <br />appropriate. Complete Prop 65 for any new <br />-Review report to determine if any immediate public <br />health concerns are found, notify supervisor <br />further notifications. Complete Prop 65 for any new <br />Environmental Assessment <br />contamination was found. If <br />new PR# be issued under PE <br />processing. Complete a Prop <br />EFID Lead Oversight Projects <br />be conducted or if closure is <br />contaminants found at the site. <br />Other Lead Agency Projects <br />health issues are found. If public <br />immediately for follow up and <br />contaminants found at the site. <br />After scope of work for the project SR is complete, update the following fields in the <br />Service Request Approval Dates section of the SR form in EC: Plan Status - choose <br />`Finaled'; Final Inspection - enter date work finalized. <br />EHD-29 8/15/17 Site Mitigation Program Checklist
The URL can be used to link to this page
Your browser does not support the video tag.